Release Management/Release Process Checklist Documentation: Difference between revisions

Improved the documentation on steps related to iOS release notes
No edit summary
(Improved the documentation on steps related to iOS release notes)
Line 486: Line 486:
# If an XXX.0 RC3 build is required, then cancel the previous RC build in Ship-It and repeat steps 3 to 6 and 11 to 12
# If an XXX.0 RC3 build is required, then cancel the previous RC build in Ship-It and repeat steps 3 to 6 and 11 to 12
# Check if there are release notes
# Check if there are release notes
#* If there are no release notes provided then us the generic release notes
#* The deadline for release notes is Tuesday during the stabilization week. Product will provide release notes and let the Release Management team know.
#* If there are no release notes provided, then use the generic release notes
# Submit Firefox iOS in the AppStore for review
# Submit Firefox iOS in the AppStore for review
#* Select a phased rollout when submitting.
#* Select a phased rollout when submitting.
Line 745: Line 746:
=iOS XXX.1 - XXX.3 Checklist=
=iOS XXX.1 - XXX.3 Checklist=


Perform the same steps as *iOS XXX.0 Checklist* but with the following exceptions:
Perform the same steps as [https://wiki.mozilla.org/Release_Management/Release_Process_Checklist_Documentation#iOS_XXX.0_Checklist iOS XXX.0 Checklist] but with the following exceptions:
* Do not build Focus iOS
* Do not build Focus iOS
* If the QA sign-off is still yellow/red by Thursday during the version stabilization week, then that version will not ship.
* If the QA sign-off is still yellow/red by Thursday during the version stabilization week, then that version will not ship.
406

edits