(initial draft) |
No edit summary |
||
| Line 69: | Line 69: | ||
(An alternative plan of four weeks of development, four weeks of alpha->beta stabilization, and four weeks of beta->release stabilization, with the alpha->beta stabilization split across the branches, would give us a 4/8 ratio, but it would mean branch controls for the last two weeks of each cycle on dev.) | (An alternative plan of four weeks of development, four weeks of alpha->beta stabilization, and four weeks of beta->release stabilization, with the alpha->beta stabilization split across the branches, would give us a 4/8 ratio, but it would mean branch controls for the last two weeks of each cycle on dev.) | ||
= References = | |||