Breakpad/Status Meetings/2014-07-16: Difference between revisions
< Breakpad | Status Meetings
Jump to navigation
Jump to search
(→Ceph) |
|||
| Line 21: | Line 21: | ||
=== Ceph === | === Ceph === | ||
* have 3 nodes now instead of 1 last week | |||
* ceph installed with the RADOS gateway | |||
* verified working with a collector | |||
* boxes need re-racking, HP asked us to wait | |||
* while we're waiting, installed socorro on a micro ec-2 instance to test s3 api | |||
** collector is fine | |||
** processor has a few issues | |||
=== DB === | === DB === | ||
Revision as of 18:08, 16 July 2014
« previous meeting — index – next week » create?
Meeting Info
Breakpad status meetings occur on Wed at 11:00am Pacific Time.
Conference numbers:
Vidyo: Stability 650-903-0800 x92 conf 98200# 800-707-2533 (pin 369) conf 98200#
IRC backchannel: #breakpad Mountain View: Dancing Baby (3rd floor)
Operations Updates
Ceph
- have 3 nodes now instead of 1 last week
- ceph installed with the RADOS gateway
- verified working with a collector
- boxes need re-racking, HP asked us to wait
- while we're waiting, installed socorro on a micro ec-2 instance to test s3 api
- collector is fine
- processor has a few issues
DB
primary - secondary - standby -
Project Updates
Socorro Release Tracker
Socorro Bug Tracker
Planned for this week
Bugzilla query error
Array ( [type] => error [message] => http-bad-status [params] => Array ( [0] => 429 [1] => Unknown Error ) ) 1
PR Triage
other business
PTOs, etc
- Adrian
- Friday, July 18: PTO
- July 21-25: EuroPython
- July 28-31: in Berlin for elmo work week
- August 1-8: PTO