| Name
|
Done
|
Plan
|
| Al
|
- Week W07 (02/09~02/13)
- MCTS v2.2
- implement device handler
- migrate architecture
- Bug 1124899 - [2.1] Hanging up a second call while the first is held no longer causes the first call to become active
|
- Week W08 (02/16~02/20)
- MCTS v2.2
- Bug 1124899 - [2.1] Hanging up a second call while the first is held no longer causes the first call to become active
- Bug 1116878 - [2.1] Most bluetooth tests fail with "app = null" error
|
| Alison
|
|
|
| Askeing
|
|
|
| Cynthia
|
|
|
| Edward
|
|
|
| Eric
|
|
|
| Gerry
|
- Week W07 (02/09~02/13)
- v2.2 feature testing
- QAnalyst bugs verification
- Nexus 5 L automation environment setup - finished
|
- Week W08 (02/16~02/17)
- v2.2 feature testing
- QAnalyst/MGSEI bugs verification
|
| Hermes
|
- Week W07 (02/09~02/13)
- Handle [E.Me Transition] tasks
- Keep L porting test on nexus 5
- Review NFC Test cases
- Monitor v2.2+ System FE Bugs
- Create test cases for short_name support on FxOS (Bug 1001861)
- Perform QA sign off for Task Manager features
|
- Week W08 (02/16~02/20)
- Handle [E.Me Transition] tasks
- Monitor v2.2+ System FE Bugs
- Perform QA sign off for App-grouping, Smart Collections, and Rocketbar & Search Suggestions feature landing (FL milestone).
|
| Hubert
|
|
|
| Mike
|
|
|
| Owen Ouyang
|
|
|
| Paul
|
|
- Week W08 (02/16~02/20)
- Memory report for new operation stuff
-- backlog --
- poc for bisect tool
- Chaos Monkey for b2g (random process killer)
- Create daemon to emit locking status
- Modifying crash report patch based on review (pending to b2gDevice in mozbase)
- Followup live test run stream
- Datazilla integration
- Memory stress test
- Revive daily mtbf test
|
| Shing
|
- Week W07 (02/09~02/13)
- Clarify 2.2 metrics scope with RD
- Metrics test cases design
- MozTrap API Expansion
- Reach out to the community for MozTrap UI work
|
- Week W08 (02/16~02/20)
- Metrics Case
- Send reports on behalf of Eric
- Take care of automation report if needed
- MozTrap API
|
| Teri
|
- Week W07 (02/09~02/13)
- V2.2 Cgroup
- Design test cases for cgroup testing
- V2.2 Bluedroid
- RD will run tests before FL, QA will start testing after FL
- Organize new hire's guide
|
- Week W08 (02/16~02/20)
- V2.2 Cgroup
- Draft test plan for cgroup testing
- Send test plan to RD for comment/review
- Research possible failure scenarios in bugzilla
- Write test cases in MozTrap
- V2.2 Bluedroid
- RD will run tests before FL, QA will start testing after FL
- Organize new hire's guide
|
| Walter
|
|
|
| William Hsu
|
- Week W07 (02/09~02/13)
- [Device] Assist Dolphin v2.1 related stuff.
- Bug triage and meetings
- Performance measurement
- [Device] Assist Flame related stuffs
- Gaia UI test on v2.0 Build
- Gaia UI test on v2.1 Build
- [Device][Outsourcing]
- Troubleshooting for automation fail cases
- Assist performance test
- RTL test case review
- Dispatch bugs of free test
- Others,
|
- Week W08 (02/16~02/20)
- [Device][Outsourcing]
- Troubleshooting for automation fail cases
- Assist performance test
- RTL test case review
- Dispatch bugs of free test
- Others,
- Support PluotSorbet
- PTO on 02/17
- Chinese New Year. (2/18~2/23)
|