Calendar:Event in a Tab: Difference between revisions

Add end of coding period date and goal
(Add project plan section)
(Add end of coding period date and goal)
Line 15: Line 15:
# Integrate with automated testing (time permitting).
# Integrate with automated testing (time permitting).


Notes: 1, 2, and 3 can be worked on concurrently.  The goal is to finish at least 1 and 2 before the midterm evaluation period (June 20-27).
Notes: 1, 2, and 3 can be worked on concurrently.  The goal is to finish at least 1 and 2 before the midterm evaluation period (June 20-27) and at least 3 and 4 before the coding period ends (August 15).


== Design ==
== Design ==