(Add project plan section) |
(Add end of coding period date and goal) |
||
| Line 15: | Line 15: | ||
# Integrate with automated testing (time permitting). | # Integrate with automated testing (time permitting). | ||
Notes: 1, 2, and 3 can be worked on concurrently. The goal is to finish at least 1 and 2 before the midterm evaluation period (June 20-27). | Notes: 1, 2, and 3 can be worked on concurrently. The goal is to finish at least 1 and 2 before the midterm evaluation period (June 20-27) and at least 3 and 4 before the coding period ends (August 15). | ||
== Design == | == Design == | ||