Auto-tools/Projects/Stockwell/Robot

< Auto-tools‎ | Projects‎ | Stockwell
Revision as of 15:59, 19 October 2017 by Gbrown (talk | contribs) (Created page with "Comments and other changes to intermittent-failure bugs by the "OrangeFactor Robot" are made by the code at https://hg.mozilla.org/automation/orangefactor/file/tip/woo_commen...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Comments and other changes to intermittent-failure bugs by the "OrangeFactor Robot" are made by the code at

https://hg.mozilla.org/automation/orangefactor/file/tip/woo_commenter.py

The woo_commenter runs in two modes, "daily" and "weekly". A cron job runs the woo_commenter in weekly mode on Sunday and in daily mode every other day of the week. The woo_commenter may add a comment to a bug and/or update its whiteboard and/or priority.

Comments

Weekly

A comment is posted to every bug with 1 or more failures in the last week.

If there were 200 failures in the last 30 days, an extra comment is added:

 ** This test has failed more than 200 times in the last 30 days. It should be disabled until it can be fixed. **

Otherwise, if there were 75 or more failures in the last week, an extra comment is added:

 ** This failure happened more than 75 times this week! Resolving this bug is a very high priority. **
 ** Try to resolve this bug as soon as possible. If unresolved for 1 week, the affected test(s) may be disabled. **

Otherwise, if there were 30 or more failures in the last week, an extra comment is added:

 ** This failure happened more than 30 times this week! Resolving this bug is a high priority. **
 ** Try to resolve this bug as soon as possible. If unresolved for 2 weeks, the affected test(s) may be disabled. **

Daily

A comment is posted to every bug with 15 or more failures in the last day.

Whiteboard

Weekly

Daily

Priority

Weekly

Daily