Mobile/Testing/04 03 13
Jump to navigation
Jump to search
Previous Action Items
blassey - PGO (gbrown), feedback on 3G emulation (mcote) wlach - Report back on regression
Status reports
Dev team
Rel Eng
IT
- Still working on a higher density chassis, parts coming in to build a prototype.
- Issues with pandas rebooting may be lack of sufficient power. 3 new power supplies installed to test this theory. 3 weeks lead time from the manufactorer to get more
A Team
- failure rates
- panda board reboot problems
- hypothesis is that our power supplies to not provide enough power, adding a second power supply will reduce our reboot and connectivity problems
- tested in chassis #2 before and after power supply addition, saw great improvements (12% to 2% failure rate)
- been working on testing in new chassis.
- Before I was seeing 12-25% failure rate on the smoketests
- now I am seeing 4.6%, 7.5%, 9.0% running the same tests.