Firefox OS/TPETeams/2015-01-07

From MozillaWiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Discussion Topics

  • 2.2 Features and L porting.
    • What cannot we land before 1/12.
  • Targets of teams in 2015Q1.
    • Performance team -
      • To build the draft performance profile for Quad-core.
      • To improve the usage of Quad-core.
      • To sync performance measurement tools with QC
      • To fix the blockers of 2.2.
      • To integrate task tracer with build-in profiler (SPS).
      • To land the memory profile tools
    • Telephony platform team -
      • To finish Android L porting for telehphony functions.
      • To fix the blockers of 2.2.
      • To finish the implementation of freezing interface.
      • To have the draft implementation of network management enhancement.
      • To Refine Telephony API for CDMA.
      • To enable test cases on KK emulator.
      • To join the V3 ideation group(P2P work) for cellular data connection topics.
      • To have a technical talk for teams.
    • Connectivity platform team -
      • To finish Android L porting for WIFI and network functions.
      • To support the new NFC webapi.
      • To fix the blockers of 2.2.
      • To improve the accuracy of data metering for cost control function.
      • To improve the network state machine for multiple connections.
      • To join V3 ideation group( P2P work) for NFC and wifi topics.
      • To have a technical talk for teams.
    • Gfx team -
      • To finish copy& paste for 2.2.
      • To finish Android L porting for gfx functions.
      • To fix the blockers of 2.2.
      • To identify the improvement plan of performance for 2015.
      • To identify the improvement plan of test flow for 2015.
      • To identify the improvement plan of debug flows and tools for 2015.
      • To join the v3 ideation group(Foxeye) for graphics topics.
      • To have a technical talk for teams.
    • Multimedia Platform team -
      • To fix the frame dropping problem for 2.2.
      • To make sure the clear key feature of DRM works on firefox OS.
      • To fix the blockers of 2.2.
      • To finish Android L porting for camera functions.
      • To replace OMS codec with Media codec.
      • To finish the draft audio refactor with perf off.
      • To enable test cases for KK emulator.
      • To host the v3 ideation group(Foxeye).
      • To have a technical talk for teams.
    • Gaia System team -
      • To support the enabling/disabling functions in settings app for volte.
      • To finish the copy&paste for gaia part.
      • To fix the blockers of 2.2.
      • To finish the implementation for Keyboard features.
      • To finish the system2 App refactor.
      • To finish the lockscreen refactor.
      • To improve the Gaia build script.
      • To work with Multimedia team for Audio refactor.
      • To share how to use bugzilla flags with teams.
  • Task Forces
    • To have experts for DOM. Leader: Gina(Device).
      • Aknow, TingYu, and Jonathan from platform teams.
    • To improve threading mechanism of firefox OS(Quadcore/8core). Leader: Thinker.
    • To improve test framework for firefox OS. Leader: Hsinyi.
    • To support the webapi for what Gaia dev request. Leader: Tim?.
    • To improve system stability. Leaders:?
    • To support 64bits in firefox OS. Leader:?