Mobile/Notes/16-Feb-2011

From MozillaWiki
< Mobile‎ | Notes
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Details

  • Wednesdays - 9:30am Pacific, 12:30pm Eastern, 16:30 UTC
  • 650-903-0800 or 650-215-1282 x92 Conf# 8605 (US/INTL)
  • 1-800-707-2533 (pin 369) Conf# 8605 (US)
  • irc.mozilla.org #mobile for backchannel

Schedule

  • Beta 5
    • Code Freeze Today
    • No blockers!

Major Topics for This Week

Front-end

  • Watching for any Beta 5 regressions
  • Working on performance, rendering and memory usages bugs
  • Working on final blockers
  • Not quite final string frozen yet
    • Waiting to land a patch after we branch for Beta 5

UX design

  • design fix proposed for this blocker: bug 611580
  • form assistant fixes look promising; to land after b5
  • working on post-4.0 awesomescreen concepts, including tablet designs

Maemo

Qt

Android

Electrolysis

General Platform

Video

Camera

Plugins

Performance

  • More improvements this week:
    • Tp dropped 3.8% from last week
    • Ts dropped 1.5% from last week
    • Rendering speed while panning is improved (reduces checkerboards)

Networking

Graphics

Startup

Layout

Content

  • Checkerboard renders faster
  • We fixed several "checkerboard won't go away after I do X" situations
  • Flash of checkerboard at the end of a pan was fixed

Memory Usage

  • Reduced amount of memory used by Sync if user is not using Sync
    • Might be more we can do too
  • Reduced amount of memory used to decode video that were not playing

Release Engineering

  • tegras
    • clientproxy script refactored to be simpler, more robust
    • updated imaging scripts for new screen resolution
    • handed off imaging to IT intern. all remaining tegras asset tagged; all but 28 tegras imaged with new screen resolution.
    • currently looking for more power before bringing up the final batch of tegras.
    • ip-controlled power switches to arrive late next week; IT will build out new server room for tegras after those arrive.
    • handed off tegra unit test work to bhearsum for more parallelization
  • lsblakk signed up for 4.0b5

QA

Other