Connected Devices Weekly Update/2016-04-19: Difference between revisions
Jump to navigation
Jump to search
(Updated Smartphone status) |
Joshwalker (talk | contribs) No edit summary |
||
| Line 52: | Line 52: | ||
*** 4/25 branch | *** 4/25 branch | ||
*** 7/15 FC | *** 7/15 FC | ||
*** 9/1 CC (confirmed w/ | *** 9/1 CC (confirmed w/ Partner) | ||
* Osaka trip | * Osaka trip | ||
** 2.6 features locked down | ** 2.6 features locked down | ||
Latest revision as of 00:28, 20 April 2016
<< Connected Devices Weekly Updates Home
| Program | Status | Notes | |
|---|---|---|---|
| Vaani | Validation (Lindsay/Sandip) | On Target |
|
| Project Link | Validation Stage (Julie/Preeti) | On Target |
Product and Research
Engineering
Participation
|
| Smart TV for 2.6 | Josh | On Target |
|
| Smart TV Next Gen | Validation (Joe/Josh) | On Target |
|
| Project SmartHome | Validation Stage (Maria/Liz) | On Target |
|
| Project Magnet | Validation Stage (Maria/Francisco) | On Target |
|
| Project Sensor Web | Cindy/Wesley | On Target |
|
| Porting | Nicole/David/Peter | On Target |
|
| FlyWeb | Nicole/Dylan | On Target |
|
| Metrics for CD | Maria/Dylan | On Target |
|
| Research Team | Lindsay | On Target |
|
| Firefox OS Smartphone Sunset | Smartphone Commercial Sunset (Karen) | On Target |
|
| Code Transition (Julie) | On Target |
| |
| Transition to Volunteer Community (George) | On Target |
| |