Peripherals/2015-04-16
Jump to navigation
Jump to search
- 2.2 FC timeline update
- 04/10: 5.1 builds ready.
- 04/13 ~ 04/14: QAs start to do testing before full run.
- 04/15 ~ 04/28: 5.1 Full run testing.
- 04/29: Feature Complete.