Sheriffing/Schedule for Tasks performed by Code Sheriffs: Difference between revisions

remove mozilla-central to mozilla-beta merges, there is only one of these merges per release cycle now and it's performed by RelEng
(remove references to mozilla-inbound repository)
(remove mozilla-central to mozilla-beta merges, there is only one of these merges per release cycle now and it's performed by RelEng)
Line 33: Line 33:
| version increase simulation || The first time beta simulations are done after the version number got increased (usually a Tuesday), later as needed - at least a week before the next version increase to verify fixes worked and no new issues have been added.
| version increase simulation || The first time beta simulations are done after the version number got increased (usually a Tuesday), later as needed - at least a week before the next version increase to verify fixes worked and no new issues have been added.
||Simulate the code in mozilla-central with the next higher version number.
||Simulate the code in mozilla-central with the next higher version number.
|- style="vertical-align:top"
| Merge mozilla-central to mozilla-beta || Daily if late in release cycle
||After beta simulations without any existing perma failures, merge mozilla-central to mozilla-beta. Use the revisions from the beta simulations.
See dates in beta simulation document when this has to be done.
|- style="vertical-align:top"
|- style="vertical-align:top"
| Clean up list of bugs which don’t get suggested || Weekly
| Clean up list of bugs which don’t get suggested || Weekly
Confirmed users
603

edits