== Release Engineering ==
== Release Engineering ==
* tegras
** 8 talos suites, 3 unittest suites live.  2 more unittest suites + a unittest fix are going to land weds morning ?
** Switched PDU is here; server room built out. Zandr needs to add racks, move tegras in, wire up.
** Stability - a lot of the issues we're seeing are due to timing. Bear has some fixes coming along; once we're on the switched PDU we should be able to write a script to keep these up in an automated fashion.
* IPC tests:
** Armen is ready to deploy Linux crashtest-ipc and a subset of reftest-ipc
** Let's try to limit scope to what's blocking