| Line 54: | Line 54: | ||
== Release Engineering == | == Release Engineering == | ||
* tegras | |||
** 8 talos suites, 3 unittest suites live. 2 more unittest suites + a unittest fix are going to land weds morning ? | |||
** Switched PDU is here; server room built out. Zandr needs to add racks, move tegras in, wire up. | |||
** Stability - a lot of the issues we're seeing are due to timing. Bear has some fixes coming along; once we're on the switched PDU we should be able to write a script to keep these up in an automated fashion. | |||
* IPC tests: | |||
** Armen is ready to deploy Linux crashtest-ipc and a subset of reftest-ipc | |||
** Let's try to limit scope to what's blocking | |||
== QA == | == QA == | ||
== Other == | == Other == | ||