Electrolysis/Short-Term Goals: Difference between revisions

Jump to navigation Jump to search
revisions from sthis week
m (moved Electrolysis/Short Terms Goals to Electrolysis/Short-Term Goals: Mis-spelling of page title)
(revisions from sthis week)
Line 70: Line 70:
Identify how existing in-product developer tools will be made compatible with content processes and what additional platform support is required. DOM Inspector will almost certainly require some additional platform support.
Identify how existing in-product developer tools will be made compatible with content processes and what additional platform support is required. DOM Inspector will almost certainly require some additional platform support.


Owner: Kevin Dangoor
Owner: Rob Campbell
Goal Date: 7-July
Goal Date: 7-July
== Deploy a Responsiveness Metric ==
Deploy a responsiveness metric which measures the average and maximum time away from the event loop.
Owner: Ted Mielczarek
Goal Date: TBD
Confirmed users, Bureaucrats and Sysops emeriti
1,217

edits

Navigation menu