Confirmed users, Bureaucrats and Sysops emeriti
1,217
edits
m (moved Electrolysis/Short Terms Goals to Electrolysis/Short-Term Goals: Mis-spelling of page title) |
(revisions from sthis week) |
||
| Line 70: | Line 70: | ||
Identify how existing in-product developer tools will be made compatible with content processes and what additional platform support is required. DOM Inspector will almost certainly require some additional platform support. | Identify how existing in-product developer tools will be made compatible with content processes and what additional platform support is required. DOM Inspector will almost certainly require some additional platform support. | ||
Owner: | Owner: Rob Campbell | ||
Goal Date: 7-July | Goal Date: 7-July | ||
== Deploy a Responsiveness Metric == | |||
Deploy a responsiveness metric which measures the average and maximum time away from the event loop. | |||
Owner: Ted Mielczarek | |||
Goal Date: TBD | |||