Electrolysis/Short-Term Goals: Difference between revisions

Jump to navigation Jump to search
devtools plan done
(clarify)
(devtools plan done)
Line 54: Line 54:


Owner: blizzard?/jorge?
Owner: blizzard?/jorge?
Goal Date: 7-July
== Developer Tools Engineering Plan ==
Identify how existing in-product developer tools will be made compatible with content processes and what additional platform support is required. DOM Inspector will almost certainly require some additional platform support.
Owner: Rob Campbell
Goal Date: 7-July
Goal Date: 7-July


Line 108: Line 101:


Owner: David Bolter
Owner: David Bolter
Goal Date: 7-July
Status: DONE (posted to mozilla.dev.planning)
== Developer Tools Engineering Plan ==
Identify how existing in-product developer tools will be made compatible with content processes and what additional platform support is required. DOM Inspector will almost certainly require some additional platform support.
Owner: Rob Campbell
Goal Date: 7-July
Goal Date: 7-July
Status: DONE (posted to mozilla.dev.planning)
Status: DONE (posted to mozilla.dev.planning)
Confirmed users, Bureaucrats and Sysops emeriti
1,217

edits

Navigation menu