Status 11: 30/08/13
=== Status 11: 30/08/13 ===
Using Based on the previous week's goal, a new installation of the Radicale CardDAV server implementationwas sought, which caused an unexpected handful of issues along the way. After these issues were addressed, we were able to test the CardDAV Connector and its features using Radicale in a real world live setting, which produced a few adjustments in the connector's handling, but otherwise confirmed the quality of the current code-base. The next task will be to finalize the code for the next Pull Request into Ensemble's master code-base.