L10n:Planning/2014-08-25: Difference between revisions
Jump to navigation
Jump to search
(→Jeff) |
(→Pike) |
||
| Line 113: | Line 113: | ||
* | * | ||
done last week: | done last week: | ||
* | * compare-locales | ||
** still load of that | |||
* pr-l10n | |||
** ad-hoc validation script for app strings | |||
* reviews | |||
=== stas === | === stas === | ||
planned for this week: | planned for this week: | ||
Revision as of 13:43, 25 August 2014
Meeting Details
- Time and location: Monday, 8 AM PST, conf bridge 206
- irc.mozilla.org #l10n-drivers for back-channel
« previous meeting — index – next week » create?
Previous Action Items
carry-overs
Meeting Notes
- Notetaker:
- Attendees:
- Put your talking points here.
- Do we want/need/have a public calendar to replace PTO app?
Action Items
carry-overs
Roundtable
arky
planned for this week:
done last week:
chofmann
planned for this week:
done last week:
Delphine
planned for this week:
done last week:
flod
Planned for this week:
- Gaia: Sep 1st is FL, not confident in the quality of landings this week
- Complete pending work before vacation next week
Done last week:
- Snippets: started new round for September (deadline Sep 15)
- Gaia: again, lot of "bad l10n" bugs.
- Tools: rewrote code for sp and p12n data extraction, new filterable view (by product, by branch)
- Restarted working on hg hook for string frozen branches
- Stage/prod updates.
gandalf
planned for this week:
done last week:
Jeff
planned for this week:
- [inpro] Finish first draft of Indic Fennec white paper.
- [inpro] Finish first draft of MQM tool Multilingual article.
- Set up Apertium & Moses on Intellego VM.
- Add to Intellego tech spec
- GSOC postmortem evaluation
- Wiki page about l10n with partners for Delphine to review.
- Plan Post-Grow l10n event (maybe L10n-SIG Training Days?)
- Fennec launch gear to Indic teams (reach out individually)
- Sort out LocWorld plans with Arky.
done last week:
- Continue phasing out Burmese & Occitan.
- Continue mentoring new Swedish localizers.
- Planned l10n events in Brazil, Paraguay, and Chile for September.
- [inpro] First draft of Indic Fennec white paper.
- [inpro] First draft of MQM tool
- Planning for visits to Brazil and South America with Guillermo and Reuben.
- Continued mentoring new Swedish localizers.
- L10n response to the Grow announcement
- Planning for September MQM sprint.
- Added more details to MQM tool spec and its placement within Firefox OS release cycle.
- UML study for Intellego, MQM, and Terminator designs.
Matjaž
planned for this week:
done last week:
Pascal
planned for this week:
done last week:
Pei
planned for this week:
done last week:
Pike
planned for this week:
done last week:
- compare-locales
- still load of that
- pr-l10n
- ad-hoc validation script for app strings
- reviews
stas
planned for this week:
done last week: