B2G/SD2012HackTargets: Difference between revisions

no edit summary
No edit summary
 
(11 intermediate revisions by 4 users not shown)
Line 3: Line 3:
[[Image:B2g-hack-targets-chart.png]]
[[Image:B2g-hack-targets-chart.png]]


Status, Wed May 9.
Status, Fri May 11.


{| class="fullwidth-table sortable" style="width: 100%;"
{| class="fullwidth-table sortable" style="width: 100%;"
Line 12: Line 12:
| style="background: none repeat scroll 0% 0% rgb(239, 239, 239);" | '''Notes'''
| style="background: none repeat scroll 0% 0% rgb(239, 239, 239);" | '''Notes'''
|-
|-
| {{ok|}}
| {{done|}}
| Vivien
| Tim
| Gaia Lockscreen
| Gaia Lockscreen
| has UX. Vivien is still working on most features.  
| Ready for the demo.  
|-
|-
| {{ok|}}
| {{ok|}}
Line 22: Line 22:
| has UX mostly. Vivien is still working on most features.  
| has UX mostly. Vivien is still working on most features.  
|-
|-
| {{miss|}}
| {{ok|}}
| Etienne
| Ben
| Gaia Dialer/contacts
| Browser
| UX designs not finalized in time
|  
|-
|-
| {{miss|}}
| {{done|}}
| Etienne
| Fernando
| Gaia New call screen
| Push Notification
| Blocked on {{bug|741587}} owned by jlebar, ETA EOD. [https://www.dropbox.com/s/hnby51wvjwbcrug/separate-call-screen.mov movie demo]
| Need to implement HTTPS, persistent connections and origin verification, but those don't block demo. Web API cannot be done, but it does not block the demo. Thinker is implementing it. Fernando has a movie demoing it, can be shown at demo time.
|-
|-
| {{miss|}}
| {{done|}}
| Tim
| Andrew S
| Gaia SMS
| Apps: Email
| Cancel - new UX designs from this week are being implemented by new Taipei engineer next week. Bent can demo new OOP IndexedDB backend though.
| Demo scenario: Create (localhost) account, show list of e-mails.
|-
|-
| {{miss|}}
| {{done|}}
| Michael V
| James
| Gralloc
| Apps: Calendar
| In-progress, not ready for Friday demo though.
| Demo scenario: Show calendar + create events. Also showing unit tests for it.
|-
|-
| {{done|}}
| {{done|}}
| Fernando
| Michael H
| Push Notification
| Camera
| Need to implement HTTPS, persistent connections and origin verification, but those don't block demo. Web API cannot be done, but it does not block the demo. Thinker is implementing it. Fernando has a movie demoing it, can be shown at demo time.
| Ready by Friday, demo some filters, etc
|-
| {{ok|}}
|
| Settings
|
|-
| {{ok|}}
|
| Music
|
|-
| {{ok|}}
|
| Video
|
|-
|-
| {{done|}}
| {{done|}}
Line 62: Line 77:
| API already spec'd, blocked on sensor firing events (same sensor on sgs2 problem as above)
| API already spec'd, blocked on sensor firing events (same sensor on sgs2 problem as above)
|-
|-
| {{ok|}}
| {{done|}}
| Fabrice
| Eric
| Web intents
| Bluetooth
| WIP patch done. Etienne working on multiple providers UI, maybe can use that to demo.
| Demo scenario: enable, browse, connect, disconnect, volumne control.
|-
| {{done|}}
| Dave H
| USB Host mounting
| Dave H is here! His demo is done!
|-
|-
| {{done|}}
| {{done|}}
| Michael H
| Kaze
| Camera
| Radio: 3G Data + Network UI
| Ready by Friday, demo some filters, etc
| Status: 3G Data is ready to demo; Kaze is working on network UI and it should be finished by this Friday and it should have no problem for the demo.
|-
|-
| {{done|}}
| {{done|}}
| Eric
| Philipp
| Bluetooth
| Test harness
| Demo scenario: enable, browse, connect, disconnect, volumne control.  
| Demo scenario: Show tests, how to do the testing...
|-
|-
| {{risk|}}
| {{risk|}}
Line 82: Line 102:
| David says DougT has early version of the API, but doesn't work on devices, only on desktop. Has a WIP patch to convert gallery to use it, may try to demo on desktop. Still at risk.
| David says DougT has early version of the API, but doesn't work on devices, only on desktop. Has a WIP patch to convert gallery to use it, may try to demo on desktop. Still at risk.
|-
|-
| {{done|}}
| {{miss|}}
| Dave H
| Etienne
| USB Host mounting
| Gaia Dialer/contacts
| Dave H is here! His demo is done!
| UX designs not finalized in time
|-
| {{miss|}}
| Fabrice
| Web intents
| WIP patch done. Etienne working on multiple providers UI, maybe can use that to demo.
|-
| {{miss|}}
| Etienne
| Gaia New call screen
| Blocked on {{bug|741587}} owned by jlebar, ETA EOD. [https://www.dropbox.com/s/hnby51wvjwbcrug/separate-call-screen.mov movie demo]
|-
| {{miss|}}
| Tim
| Gaia SMS
| Cancel - new UX designs from this week are being implemented by new Taipei engineer next week. Bent can demo new OOP IndexedDB backend though.
|-
| {{miss|}}
| Michael V
| Gralloc
| In-progress, not ready for Friday demo though.
|-
|-
| {{ok|}}
| {{miss|}}
| Ben T
| Ben T
| IndexedDB OOP
| IndexedDB OOP
Line 96: Line 136:
| Radio: MMS
| Radio: MMS
| In-progress, not ready for Friday demo though. {{bug|749856}}, {{bug|744360}}.  
| In-progress, not ready for Friday demo though. {{bug|749856}}, {{bug|744360}}.  
|-
| {{ok|}}
| Kaze
| Radio: 3G Data + Network UI
| Status: 3G Data is ready to demo; Kaze is working on network UI and it should be finished by this Friday and it should have no problem for the demo.
|-
| {{done|}}
| Andrew S
| Apps: Email
| Demo scenario: Browse, compose mails.
|-
| {{done|}}
| James
| Apps: Calendar
| Demo scenario: Show calendar + create events.
|-
| {{done|}}
| Philipp
| Test harness
| Demo scenario: Show tests, how to do the testing...
|}
|}
canmove, Confirmed users, Bureaucrats and Sysops emeriti
496