Firefox OS/DeviceQA/2014-09-01WeeklyReport: Difference between revisions
< Firefox OS | DeviceQA
(Created page with " Last week | Next week {| class="wikitable" class="fullwidth-table" border="1"...") |
m (Lakrits moved page FirefoxOS/DeviceQA/2014-09-01WeeklyReport to Firefox OS/DeviceQA/2014-09-01WeeklyReport: The official spelling of "Firefox OS" leaves a space between the two parts of the name. It's easier to find a page if the spelling of it...) |
||
| (18 intermediate revisions by 13 users not shown) | |||
| Line 1: | Line 1: | ||
[[FirefoxOS/DeviceQA/2014- | [[FirefoxOS/DeviceQA/2014-08-25WeeklyReport | Last week]] | [[FirefoxOS/DeviceQA/2014-09-08WeeklyReport | Next week]] | ||
{| class="wikitable" class="fullwidth-table" border="1" | {| class="wikitable" class="fullwidth-table" border="1" | ||
| Line 7: | Line 7: | ||
! align="center" style="width: 45%;" | Plan | ! align="center" style="width: 45%;" | Plan | ||
|- | |- | ||
| | | Shing | ||
| | || | ||
| | * Week W36 (09/01~09/07): | ||
** Learned B2G-flash-tool. | |||
** Smoketest 2.0. | |||
** Walked through gaia-ui-test tutorial on MDN. | |||
** Learned how to file bugs with Bugzilla. | |||
** Looked into Bug 921965. | |||
** Finished various new-hire-related tasks. | |||
|| | |||
* Week W36 (09/08~09/12): | |||
** Follow up on Bug 921965. | |||
** Find more qawanted bug to participate. | |||
** Try to fix Bug 1034780 as a practice for the gaia submittion flow. | |||
** Prepare for study group sharing. | |||
|- | |- | ||
| | | Paul | ||
| | || | ||
| | * Review test case patches | ||
| | * Lab scale-up plan | ||
* Feedback arima for browser test cases | |||
* Add log timestamp in mtbf-v2.0 branch | |||
* Crash report patch | |||
|| | |||
* Trigger first test run on v2.1 | |||
* Modify crash report patch based on review | |||
* Followup lab setup issue | |||
-- backlog -- | |||
* Followup live test run stream | |||
* Datazilla integration | |||
* Bug fix for in-testcase logging | |||
* Draw figure to intro. mtbf | |||
|- | |||
| eric | |||
|| | |||
* Week W36 (09/01~09/05): | |||
** Sign off v2.1 landed features | |||
** Take over Dialer, Contacts features from Johan | |||
** Create test cases for bug 877971 | |||
** Create test cases for bug 1042591 | |||
** Smoketest support for 9/1, 9/2 | |||
|| | |||
* Week W37 (09/09~09/12): | |||
** Test Run for COMMS | |||
** PTS v2.1 | |||
** Help with full run | |||
|- | |||
| Gerry | |||
|| | |||
* Week W36 (09/01~09/05): | |||
** v2.1 Finish creating test case - bug 1024776 - Support for EU Internet APN | |||
** Smoketest support for 9/1, 9/2 | |||
** Finish testing bug 1035250 | |||
** Finish testing bug 1026098 | |||
** Verify 2.1 bugs | |||
|| | |||
* Week W37 (09/09~09/12): | |||
** Start to test bug 1024776 | |||
** Start to test bug 1023818 - [User Story][Lockscreen] Taking action on lock screen notifications | |||
|- | |||
| Mike | |||
|| | |||
* Week W36 (09/01~09/05): | |||
**Categorize test cases from version tags (70%) | |||
**Test case mind map creation | |||
**Flame KK v1.4 release candidate verification: v167 | |||
**Madai bugs verification | |||
|| | |||
* Week W37 (09/09~09/12): | |||
**Categorize test cases from version tags (cont.) | |||
**Test case mind map creation | |||
**Flame KK v2.0 base image verification | |||
**Madai bugs verification | |||
|- | |||
| Hubert | |||
|| | |||
* Week W36 (09/01~09/05): | |||
**Execute Woodduck regression test | |||
**Follow up Woodduck tasks and issues | |||
**Woodduck weekly meeting | |||
**Plan Woodduck Automatic testing. | |||
|| | |||
* Week W37 (09/09~09/12): | |||
**Execute Woodduck regression test | |||
**Follow up Woodduck tasks and issues | |||
**Woodduck weekly meeting | |||
**Plan Woodduck Automatic testing | |||
**Woodduck triage meeting | |||
**Execute Woodduck 2nd test run | |||
|- | |||
| Al | |||
|| | |||
* Week 36 (09/01~09/05): | |||
** Monkey Test stability run on local PC - Passed | |||
** Support Woodduck Issues | |||
** Local Vixen build verification on Mac | |||
|| | |||
* Week 37 (09/09~09/12) | |||
** Check issues found on Vixen w/ TAM & partners | |||
** Monkey Test migrates to TWCI-Jenkins and changes to v2.1 (Flame) | |||
** Tools for collection logs | |||
|- | |||
| Alison | |||
|| | |||
* Week 36 (09/01~09/05): | |||
** Bugs verification | |||
** Sign off v2.1 landed features | |||
** Smoketest support for 9/1, 9/2 | |||
** Full run test - [Devices] Test Media Transfer Protocol (MTP) (bug 922927) | |||
** Full run test - [Ringtones] Test transfer ringtones from SD card to ringtones folder (bug 1027995) | |||
** Full run test - [NFC] Test tap-to-pay user story (bug 979152) | |||
|| | |||
* Week 37 (09/09~09/12) | |||
** Update test cases - Bug 979157 [B2G][NFC][User Story]: Tap-to-go (using MIFARE 1k) functionality to pass through gates | |||
** Update Wiki for how to use MIFARE discover software which is provided by NXP (http://mzl.la/1wdz0i6) | |||
** Prepare NFC workweek QA session | |||
|- | |||
| Askeing | |||
|| | |||
* Week 36 (09/01~09/05): | |||
** Develop the combo-runner framework. (https://github.com/Mozilla-TWQA/combo-runner) | |||
** Refactoring the scripts of MTBF/CI. | |||
** Prepare the slides of Git Tips. (http://askeing.github.io/Slides/git-tips/) | |||
** Prepare the information of outsourcing. | |||
|| | |||
* Week 37 (09/09~09/12) | |||
** Develop the combo-runner framework. | |||
** Refactoring the scripts of MTBF/CI. | |||
** Develop the flashing tools. | |||
** Prepare the information of outsourcing. | |||
|- | |||
| Cynthia | |||
|| | |||
* Week 36 (09/01~09/05): | |||
** Support 2.0 Woodduck Test Run 1 (http://goo.gl/m5TT0E) | |||
** Prepare devices for MBTF test | |||
|| | |||
* Week 37 (09/09~09/12) | |||
** Execute Woodduck daily smoke test | |||
|- | |||
| Walter | |||
|| | |||
* Week 36 (09/01~09/05): | |||
** Bug works | |||
** Create 10+ test cases | |||
** Review pull requests | |||
** other meetings and new stuffs | |||
** lab environment, phone setup, phone flash, other setup | |||
** Prepare devices for MBTF test | |||
|| | |||
* Week 37 (09/09~09/12) | |||
** Bug works | |||
** Review pull requests | |||
** lab environment, phone setup, phone flash, other setup | |||
|- | |||
| William Hsu | |||
| | |||
*'''Week W36 (09/01~09/05)''' | |||
** [Routine] Bug replication, submission, and verification. | |||
**# 14 bugs from the time of the writing of this (Ref: http://goo.gl/hwB40h) | |||
** [Device] Assist device related tests - Dolphin | |||
**# Combination testing ( Ref: http://goo.gl/t8dEqw ) | |||
** [Device] Assist device related tests - Tako | |||
**# Gaia UI test | |||
**# Set up IIS server for Tako Flash tool (Server side) | |||
**# Install Tako flash tool and collect license key request (Client side) | |||
**# Write down the installation guide of FG3 tool - (Ref:http://goo.gl/pe8iQf) | |||
**# Discussing Tako automation related problems with partner | |||
***# MTBF | |||
***# B2Gperf | |||
***# Gaia UI Test | |||
** Others, | |||
**# One day PTO (9/5) | |||
**# Collect system information (shipped devices) for Mozilla metrics team | |||
| | |||
*'''Week W37 (09/08~09/12)''' | |||
** [Device] Assist device related tests - Dolphin | |||
**# Help partner to review E.ME performance. | |||
** [Device] Assist device related tests - Tako | |||
**# Install FG3 server on VM and deploy it to Amazon EC2 with authentication mechanism protected | |||
**# Install FG3 client on VM and share with MTV office | |||
**# Smoketest on Tako | |||
** Others, | |||
**# National holiday (9/08) | |||
**# Team Building (9/11) | |||
Latest revision as of 13:49, 1 February 2015
| Name | Done | Plan |
|---|---|---|
| Shing |
|
|
| Paul |
|
-- backlog --
|
| eric |
|
|
| Gerry |
|
|
| Mike |
|
|
| Hubert |
|
|
| Al |
|
|
| Alison |
|
|
| Askeing |
|
|
| Cynthia |
|
|
| Walter |
|
|
| William Hsu |
|
|