Firefox OS/DeviceQA/2014-09-22WeeklyReport: Difference between revisions

No edit summary
m (Lakrits moved page FirefoxOS/DeviceQA/2014-09-22WeeklyReport to Firefox OS/DeviceQA/2014-09-22WeeklyReport: The official spelling of "Firefox OS" leaves a space between the two parts of the name. It's easier to find a page if the spelling of it...)
 
(8 intermediate revisions by 7 users not shown)
Line 16: Line 16:
||
||
* Week W39 (09/22~09/26):
* Week W39 (09/22~09/26):
**Take care of Flame KK v2.0 automation reports
**Clarify and reproduce Woodduck issues on Flame (http://goo.gl/W577ka)
||
||
 
* Week W40 (09/29~10/03):
**Take care of Flame KK v2.0 automation reports
**Clarify and reproduce Woodduck issues on Flame (http://goo.gl/W577ka)
|-
|-
| Gerry
| Gerry
Line 36: Line 40:
**Project management training
**Project management training
||
||
 
* Week W40 (09/29~10/03):
**Flame base image verification: v184
**Madai bug verification
**Extend Orangutan capability
**3rd party app performance measurement
|-
|-
| eric
| eric
Line 58: Line 66:
* bug 1064800 - Re-test on master and v2.1
* bug 1064800 - Re-test on master and v2.1
* Fix test case error
* Fix test case error
* Trigger full run on v2.1
* Trigger full run on v2.1  
||
* bug 1064800
* Setup device for flame_kk
* Workaround for v2.0 software home button
* Fix test case error
* Patch for reusing marionette instance
* Trigger custom build run for patch 1064800
* Modify crash report patch based on review  
* Modify crash report patch based on review  
-- backlog --
-- backlog --
Line 64: Line 79:
* Datazilla integration
* Datazilla integration
* Bug fix for in-testcase logging
* Bug fix for in-testcase logging
||
|-
|-
| William Hsu
| William Hsu
Line 83: Line 96:
*** Prepare jobs for Flame KK
*** Prepare jobs for Flame KK
*** Gaia UI test on v2.0 Build
*** Gaia UI test on v2.0 Build
*** Analyze problem of rescue tool
|
|
*'''Week W40 (09/29~10/03)'''
*'''Week W40 (09/29~10/03)'''
Line 94: Line 108:
**# Gaia UI test on v2.0 Build
**# Gaia UI test on v2.0 Build
**# v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn)
**# v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn)
** [OS] Help address full-run blockers
|-
|-
| Alison Shiue
| Alison Shiue
Line 117: Line 130:
|
|
* Week W39 (09/22~09/26)
* Week W39 (09/22~09/26)
** Bug solving for mtbf
** MTBF test runs*2
** interviews
||
||


Line 123: Line 139:
|
|
* Week W39 (09/22~09/26)
* Week W39 (09/22~09/26)
** Support metrics testing
** Apps usage metrics testing
** Test copy-paste feature for v2.1 (Bug 1023688)
** Cost Control testing
** Automate P1 test cases for copy-paste
** Cost Control test cases design
** Cost Control performance regression investigation
||
||
*Week W40 (09/29~10/03)
** Cost Control test cases design
** Apps usage metrics test cases design
** Read ''Pragmatic Software Testing''
** Prepare sharing on how to submit app to Firefox Marketplace


|-
|-
Line 146: Line 168:
** Develop the flashing tools.
** Develop the flashing tools.
** Prepare the information of outsourcing.
** Prepare the information of outsourcing.
||
|
*Week W40 (09/29~10/03)
** Investigate the MCTS.
** Develop the flashing tools for MTBF.
** Prepare the information of outsourcing.
** Follow up the Card UI user story.
|

Latest revision as of 13:49, 1 February 2015

Last week | Next week

Name Done Plan
Hubert
  • Week W39 (09/22~09/26):
Cynthia
  • Week W39 (09/22~09/26):
    • Take care of Flame KK v2.0 automation reports
    • Clarify and reproduce Woodduck issues on Flame (http://goo.gl/W577ka)
  • Week W40 (09/29~10/03):
    • Take care of Flame KK v2.0 automation reports
    • Clarify and reproduce Woodduck issues on Flame (http://goo.gl/W577ka)
Gerry
  • Week W39 (09/22~09/26):
    • Test App usage metrics
    • Finish EU-support test
    • Verify 2.1 bugs
Mike
  • Week W39 (09/22~09/26):
    • Test case mind map creation
    • Tarako power drain issue follow up
    • Madai bug verification
    • Project management training
  • Week W40 (09/29~10/03):
    • Flame base image verification: v184
    • Madai bug verification
    • Extend Orangutan capability
    • 3rd party app performance measurement
eric
  • Week W39 (09/22~09/26):
    • Test Run for RIL
    • Exploratoy against v2.1
    • Feature page index for OS
    • Verification of bugs before FC
    • Fixing RIL/COMMS test cases
  • Week W40 (09/29~10/03):
    • Exploratoy against v2.1
    • Feature page index for OS
    • Verification of bugs before CC
    • Fixing SMS/STK test cases
    • Reviewing smoke test case
Paul
  • bug 1064800 - Re-test on master and v2.1
  • Fix test case error
  • Trigger full run on v2.1
  • bug 1064800
  • Setup device for flame_kk
  • Workaround for v2.0 software home button
  • Fix test case error
  • Patch for reusing marionette instance
  • Trigger custom build run for patch 1064800
  • Modify crash report patch based on review

-- backlog --

  • Followup live test run stream
  • Datazilla integration
  • Bug fix for in-testcase logging
William Hsu
  • Week W39 (09/22~09/26)
    • [Routine] Bug replication, submission, and verification.
    • [Device] Assist device related tests - Tako
      • Smoketest on Tako (ETA:9/25)
      • Gaia UI test on Tako (ETA:9/23)
      • Test strategy for CAF ES2 build (v2.0)
      • Prepare All-in-one test machine/VM for partner (Part I: Packages installation 9/26)
      • Weekly meeting with partner (9/23)
        1. Address automation test related problems
        2. Three-way synchronization with partners (progress)
    • [Device] Assist device related tests - Flame
      • Prepare jobs for Flame KK
      • Gaia UI test on v2.0 Build
      • Analyze problem of rescue tool
  • Week W40 (09/29~10/03)
    • [Device] Assist device related tests - Tako
      • Prepare All-in-one test machine/VM for partner (Part II: System Configuration 9/29~9/30)
      • Smoketest on Tako (ETA:10/02)
      • Gaia UI test on Tako (ETA:9/30)
      • Weekly meeting with partner (9/30)
        1. Three-way synchronization (project status)
    • [Device] Assist device related tests - Flame
      1. Gaia UI test on v2.0 Build
      2. v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn)
Alison Shiue
  • Week W39 (09/22~09/26)
    • Bugs verification
    • [Bluetooth] Update test cases at mozrtrap
Al
  • Week W39 (09/22~09/26)
    • Woodduck weekly triage
    • Privacy Panel Feature for v2.1
    • MCTS for v2.0/v2.1
    • Monkey Test
Walter Chen
  • Week W39 (09/22~09/26)
    • Bug solving for mtbf
    • MTBF test runs*2
    • interviews
Shing
  • Week W39 (09/22~09/26)
    • Apps usage metrics testing
    • Cost Control testing
    • Cost Control test cases design
    • Cost Control performance regression investigation
  • Week W40 (09/29~10/03)
    • Cost Control test cases design
    • Apps usage metrics test cases design
    • Read Pragmatic Software Testing
    • Prepare sharing on how to submit app to Firefox Marketplace
Edward
  • Week W39 (09/22~09/26)
    • Test/ verify sprint 5 tickets
    • Plan rearrangement resource for feature owner.
    • Smoke test for productivity apps with KK image
Askeing
  • Week W39 (09/22~09/26)
    • Develop the combo-runner framework.
    • Investigate the MCTS.
    • Fix the building/testing jobs on CI server.
    • Develop the flashing tools.
    • Prepare the information of outsourcing.
  • Week W40 (09/29~10/03)
    • Investigate the MCTS.
    • Develop the flashing tools for MTBF.
    • Prepare the information of outsourcing.
    • Follow up the Card UI user story.