Firefox OS/DeviceQA/2014-10-27WeeklyReport: Difference between revisions
< Firefox OS | DeviceQA
(Copied last week's plan) |
m (Lakrits moved page FirefoxOS/DeviceQA/2014-10-27WeeklyReport to Firefox OS/DeviceQA/2014-10-27WeeklyReport: The official spelling of "Firefox OS" leaves a space between the two parts of the name. It's easier to find a page if the spelling of it...) |
||
| (18 intermediate revisions by 14 users not shown) | |||
| Line 1: | Line 1: | ||
[[FirefoxOS/DeviceQA/2014-10-13WeeklyReport | Last week]] | [[FirefoxOS/DeviceQA/2014- | [[FirefoxOS/DeviceQA/2014-10-13WeeklyReport | Last week]] | [[FirefoxOS/DeviceQA/2014-11-03WeeklyReport | Next week]] | ||
{| class="wikitable" class="fullwidth-table" border="1" | {| class="wikitable" class="fullwidth-table" border="1" | ||
| Line 10: | Line 10: | ||
|| | || | ||
* Week W44 (10/27~10/31): | * Week W44 (10/27~10/31): | ||
** Finish MCTS testing on v2.0 | ** Mozilla Certificate Test Suite | ||
*** Finish MCTS testing on v2.0 | |||
*** Start to track bug list and check the status | |||
** Africacom support | ** Africacom support | ||
*** Testing on real devices ( | *** Testing on real devices (Open C by @Cynthia) | ||
** Support Privacy Panel feature test review | ** Support Privacy Panel feature test review | ||
|| | || | ||
** Mozilla Certificate Test Suite | |||
*** Status update [http://goo.gl/4eAedO MCTS Bug list] | |||
** Remove unnecessary test environment from moztrap | |||
** new comer training | |||
|- | |- | ||
| Alison | | Alison | ||
|| | || | ||
* Week W44 (10/27~10/31): | * Week W44 (10/27~10/31): | ||
** Bugs verification | ** Bugs verification | ||
| Line 25: | Line 29: | ||
** Test cases categorization for Peripherals | ** Test cases categorization for Peripherals | ||
|| | || | ||
* Week W45 (11/3~11/7): | |||
** Bugs verification | |||
** Go through NFC secure element API (2.2 feature) test spec with DT developer | |||
** Try run marionette test for real device | |||
|- | |- | ||
|Askeing | |Askeing | ||
| Line 33: | Line 40: | ||
** Follow up the Card UI tasks and issues. | ** Follow up the Card UI tasks and issues. | ||
** Connected Devices meeting. | ** Connected Devices meeting. | ||
** Multithreading the tk GUI. | |||
** Hide the console cursor. | |||
|| | || | ||
* Week W45 (11/3~11/7): | |||
** Connected Devices meeting. | |||
** Follow up the issues of Connected Devices. | |||
** Develop cross-platform tools by Python. | |||
|- | |- | ||
| Cynthia | | Cynthia | ||
| Line 41: | Line 54: | ||
** Executing Gaia UI test on Woodduck and update reports on wiki (Daily) | ** Executing Gaia UI test on Woodduck and update reports on wiki (Daily) | ||
** Test/verify bugs for woodduck. | ** Test/verify bugs for woodduck. | ||
** | ** Marionette JS automation script for Settings-24 hour time format | ||
** Create the test case | ** Create the test case | ||
*** Bug 0912002 - Support forwarding attachments | *** Bug 0912002 - Support forwarding attachments | ||
*** Bug 1023658 - Hide CC and BCC fields while composing an email | *** Bug 1023658 - Hide CC and BCC fields while composing an email | ||
|| | |||
* Week W45 (11/3~11/7): | |||
** Marionette JS automation script for Email-Signature | |||
*** In setting, default signature is "Sent Using Firefox OS" | |||
*** In account setting, edit signature | |||
*** Set signature in new account page | |||
*** Original signature cannot be changed when user modified signature in mail body | |||
** Africacom support: Assist Al in testing on Open C | |||
** Take care of Flame KK v2.0 automation reports (Daily) | |||
** Executing Gaia UI test on Woodduck and update reports on wiki (Daily) | |||
** Test/verify bugs for woodduck | |||
|| | || | ||
|- | |- | ||
| Line 56: | Line 80: | ||
*** Create v2.1 automation script | *** Create v2.1 automation script | ||
|| | || | ||
* Week W45 (11/3~11/7): | |||
** Verify sprint 7 and 8 tickets of productivity | |||
** Create test cases (user flow) for power consumption. | |||
** QAwanted bug verification and figure out issue. | |||
|- | |- | ||
| Eric | | Eric | ||
|| | || | ||
* Week W44 (10/27~10/31): | * Week W44 (10/27~10/31): | ||
** Bug bash - bug evaluation & filing | ** Bug bash - bug evaluation & filing | ||
** Market customization testing | ** Market customization testing | ||
** Feature testing page | ** Feature testing page | ||
|| | || | ||
* Week W45 (11/3~11/7): | |||
** API testing checking | |||
** Market customization testing | |||
** Bugs testing with local patch | |||
|- | |- | ||
|Gerry | |Gerry | ||
| Line 71: | Line 101: | ||
* Week W44 (10/27~10/31): | * Week W44 (10/27~10/31): | ||
** Bug bash - bug evaluation & filing | |||
** Test cases categorization for "System Platform" | ** Test cases categorization for "System Platform" | ||
** Follow up and verify bugs. | ** Follow up and verify bugs. | ||
|| | || | ||
* Week W45 (11/3~11/7): | |||
** Finish test cases categorization for "System Platform" | |||
** Follow up and verify bugs reported by QAnalyst. | |||
|- | |- | ||
| Hubert | | Hubert | ||
| Line 85: | Line 119: | ||
**Outsourcing weekly meeting | **Outsourcing weekly meeting | ||
|| | || | ||
* Week W45 (11/03~11/07): | |||
**Follow up Woodduck tasks and issues | |||
**Handle outsource tasks | |||
**Review issues filed by Marigold | |||
**Woodduck triage meeting | |||
**Outsourcing weekly meeting | |||
**Generate power consumption test cases | |||
**Survey power consumption test | |||
|- | |- | ||
| Mike | | Mike | ||
|| | || | ||
* Week W44 (10/27~10/31): | * Week W44 (10/27~10/31): | ||
**Bug bash follow-up work | **Bug bash follow-up work | ||
**Bug reproduction | **Bug reproduction | ||
** | **Power consumption investigation | ||
**Flame FOTA verification | |||
|| | || | ||
* Week W45 (11/3~11/7): | |||
**Flame FOTA verificaton | |||
**Discuss power consumption benchmark | |||
|- | |- | ||
| Paul | | Paul | ||
|| | || | ||
* Bug reproduction | * Bug reproduction | ||
* | * Partner support | ||
|| | |||
* Modify lab script by python | |||
* Merge debug setting tools | |||
-- backlog -- | -- backlog -- | ||
* Evaluating test solution on mac mini | * Evaluating test solution on mac mini | ||
| Line 105: | Line 155: | ||
* Modifying crash report patch based on review | * Modifying crash report patch based on review | ||
* Chaos Monkey for b2g (random process killer) | * Chaos Monkey for b2g (random process killer) | ||
* Memory stress test | |||
|- | |- | ||
| Shing | | Shing | ||
| Line 111: | Line 161: | ||
* Week W43 (10/27~10/31): | * Week W43 (10/27~10/31): | ||
** | ** Supported Bug Bash. | ||
** | ** Verified cost control bugs. | ||
** | ** Practiced Marionette JS automation. | ||
** Studied performance tuning for MozTrap. | |||
|| | |||
* Week W44 (11/3~11/7): | |||
** Verify Bugs. | |||
** Cost control automation. | |||
** MozTrap Performance . | |||
** Practice App with persistence. | |||
** Backlog: | ** Backlog: | ||
*** Improve MozTrap helper addon. | *** Improve MozTrap helper addon. | ||
|- | |- | ||
| Teri | | Teri | ||
| Line 126: | Line 182: | ||
** Study how to write/run FxOS app. | ** Study how to write/run FxOS app. | ||
** Study Gaia UI test. | ** Study Gaia UI test. | ||
** Verify Marigold test reports. | |||
|| | || | ||
* Week W44 (11/3~11/7): | |||
** Verify Marigold test reports. | |||
** Learn to write/run FxOS app. | |||
** Learn about productivity apps. | |||
|- | |- | ||
| Walter | | Walter | ||
| Line 134: | Line 195: | ||
** Taking care of Bugs | ** Taking care of Bugs | ||
*** Bug 1074063 - [MTBF][B2G] white & black screen | *** Bug 1074063 - [MTBF][B2G] white & black screen | ||
**** | **** Verified | ||
*** Bug 1076605 - [MTBF][App Launch] Apps can't be launch | *** Bug 1076605 - [MTBF][App Launch] Apps can't be launch | ||
**** | **** Not reproducible | ||
*** Bug 1077292 - [MTBF][B2G] Phone shutdown due to high power consumption and chopped charging | *** Bug 1077292 - [MTBF][B2G] Phone shutdown due to high power consumption and chopped charging | ||
*** Bug 1084179 - [MTBF][B2G][Stability][Camera] Camera App will be black with button visible | *** Bug 1084179 - [MTBF][B2G][Stability][Camera] Camera App will be black with button visible | ||
**** Not reproducible | |||
** Restruct | ** Restruct | ||
** | *** Simplify flow and lots of discussion | ||
** Presentation of MTBF and its knowledge | |||
|| | || | ||
* Week W45 (11/3~11/7): | |||
** Taking care of Bugs | |||
*** Bug 1077292 - [MTBF][B2G] Phone shutdown due to high power consumption and chopped charging | |||
*** Bug 1092924 - [MTBF][B2G] B2G crashed due to oom or other related issues. | |||
** Restruct | |||
|- | |- | ||
| William Hsu | | William Hsu | ||
|| | || | ||
* '''Week W44 (10/27~10/31)''' | * '''Week W44 (10/27~10/31)''' | ||
** [Device] Assist | ** [Routine] 24 bug from the time of the writing of this (Ref: http://goo.gl/LDmSXl) | ||
** [Device] Assist Tako related stuffs | |||
**# Assign Tako's bugs to developers and stakeholders. | **# Assign Tako's bugs to developers and stakeholders. | ||
**# Executing Gaia UI test on Tako v2.0 build (ETA: 10/28) | **# Executing Gaia UI test on Tako v2.0 build (ETA: 10/28) | ||
**# Weekly meeting with partner (10/28) | **# Weekly meeting with partner (10/28) | ||
**# Tako v2.1 Test Plan | **# Tako v2.1 Test Plan (Ref: http://goo.gl/Zt65tp ) | ||
** [Device] Assist | |||
** | ** [Device] Assist Flame related stuffs | ||
** | *** Gaia UI test on v2.0 Build | ||
** | *** v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn) | ||
*** Gaia UI test - Address camera failed tests | |||
***# test_camera_capture_video.py | |||
***# test_camera_multiple_shots.py | |||
***# test_lockscreen_unlock_to_camera_with_passcode.py | |||
***# test_dialer_airplane_mode.py | |||
|| | || | ||
* '''Week W45 (11/03~11/07)''' | |||
** [Device] Assist Tako related stuffs | |||
**# Assign Tako's bugs to developers and stakeholders. | |||
**# Weekly meeting with partner (11/04, TBC) | |||
** [Device] Assist Flame related stuffs | |||
*** Gaia UI test on v2.0 Build | |||
*** v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn) | |||
*** Address camera failed tests | |||
***# test_sms_with_attachments.py | |||
***# test_camera_flash_modes.py | |||
** Others, | |||
*** Health examination: Nov. 3rd (Morning). | |||
*** Personal leave: 11/06~11/10. | |||
|} | |} | ||
Latest revision as of 13:49, 1 February 2015
| Name | Done | Plan | |
|---|---|---|---|
| Al |
|
| |
| Alison |
|
| |
| Askeing |
|
| |
| Cynthia |
|
|
|
| Edward |
|
| |
| Eric |
|
| |
| Gerry |
|
| |
| Hubert |
|
| |
| Mike |
|
| |
| Paul |
|
-- backlog --
| |
| Shing |
|
| |
| Teri |
|
| |
| Walter |
|
| |
| William Hsu |
|
|