FirefoxOS/DeviceQA/2015-09-28WeeklyReport: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
(update weekly report) |
||
| (6 intermediate revisions by 5 users not shown) | |||
| Line 14: | Line 14: | ||
** Bugs work from QAnalyst/Marigold | ** Bugs work from QAnalyst/Marigold | ||
|| | || | ||
* Week W40 (09/28~10/ | * Week W40 (09/28~10/02) | ||
** [v2.5 Tracking Protection] Confirm 2.5 scope | ** [v2.5 Tracking Protection] Confirm 2.5 scope | ||
** [v2.5 Tracking Protection] Study feature and write test plan | ** [v2.5 Tracking Protection] Study feature and write test plan | ||
| Line 23: | Line 23: | ||
|| | || | ||
* Week W39 (09/21~09/25) | * Week W39 (09/21~09/25) | ||
** Prepare Slides of Academy Program | |||
** Investigate the biwet issue | |||
** Develop the prototype of TC DL | |||
|| | || | ||
* Week W40 (09/28~10/ | * Week W40 (09/28~10/02) | ||
** Academy program preparation | |||
** Investigate the biwet issue | |||
|- | |- | ||
| Cynthia | | Cynthia | ||
|| | || | ||
* Week W39 (09/21~09/25) | * Week W39 (09/21~09/25) | ||
** [v2.5 TV - TV Deck] Design test cases and execute the testing | |||
** [v2.5 TV - EPG] Design test cases and execute the testing | |||
** [v2.5 TV] Bugs work | |||
|| | || | ||
* Week W40 (09/28~10/ | * Week W40 (09/28~10/02) | ||
** [v2.5 TV - Pocket Integration] Study feature and create test cases | |||
** [v2.5 TV - Bookmark Sync] Study feature in desktop for preparing the test account | |||
** [v2.5 TV] Bugs work | |||
|- | |- | ||
|Gerry | |Gerry | ||
| Line 41: | Line 48: | ||
|| | || | ||
* Week W40 (09/28~10/ | * Week W40 (09/28~10/02) | ||
|- | |- | ||
| Line 51: | Line 58: | ||
** Study ftu-ping, app usage testing | ** Study ftu-ping, app usage testing | ||
|| | || | ||
* Week W40 (09/28~10/ | * Week W40 (09/28~10/02) | ||
** Set up Telemetry server/device/environment | ** Set up Telemetry server/device/environment | ||
** Study Telemetry testing | ** Study Telemetry testing | ||
| Line 62: | Line 69: | ||
|| | || | ||
* Week W40 (09/28~10/ | * Week W40 (09/28~10/02) | ||
** [New Tool Development] | ** [New Tool Development] | ||
*** Survey Docker | *** Survey Docker | ||
| Line 77: | Line 84: | ||
*** Study New Security Model | *** Study New Security Model | ||
|| | || | ||
* Week W40 (09/28~10/ | * Week W40 (09/28~10/02) | ||
** NSec WW | ** NSec WW | ||
|- | |- | ||
| Line 83: | Line 90: | ||
|| | || | ||
* Week W39 (09/21~09/25) | * Week W39 (09/21~09/25) | ||
** integrating crash-bug-report system | |||
|| | || | ||
* Week W40 (09/28~10/ | * Week W40 (09/28~10/02) | ||
** support replaceable homescreen | |||
|- | |- | ||
| Shako Ho | | Shako Ho | ||
|| | || | ||
* Week W39 (09/21~09/25) | * Week W39 (09/21~09/25) | ||
** MTBF | |||
*** integrate the raptor Minion with boss framework [in progress] | |||
*** Fix MTBF test cases on aries [done] | |||
|| | || | ||
* Week W40 (09/28~10/ | * Week W40 (09/28~10/02) | ||
** MTBF | |||
*** integrate the raptor Minion with boss framework [in progress] | |||
*** Fix MTBF test cases on aries [done] | |||
|- | |- | ||
| Line 99: | Line 112: | ||
|| | || | ||
* Week W39 (09/21~09/25) | * Week W39 (09/21~09/25) | ||
** RedSquare workshop at Mountain View | |||
|| | || | ||
* Week W40 (09/28~10/ | * Week W40 (09/28~10/02) | ||
** (PTO for 2 days) | |||
** RedSuqare QA SOW | |||
** QA Test addons | |||
** Academy program preparation | |||
|- | |- | ||
| Teri | | Teri | ||
| Line 121: | Line 137: | ||
*** 2 blocked bugs: 1208310, 1208337 | *** 2 blocked bugs: 1208310, 1208337 | ||
|| | || | ||
* Week W40 (09/28~10/ | * Week W40 (09/28~10/02) | ||
** [V2.5] Replaceable Homescreen | ** [V2.5] Replaceable Homescreen | ||
*** Part 2 replaceable homescreen code landed | *** Part 2 replaceable homescreen code landed | ||
| Line 137: | Line 153: | ||
** Planning for better ways of MCTS Cert reference generation | ** Planning for better ways of MCTS Cert reference generation | ||
|| | || | ||
* Week W40 (09/28~10/ | * Week W40 (09/28~10/02) | ||
** holidays on 9/28 & 9/29 | ** holidays on 9/28 & 9/29 | ||
** matching issues in bugzilla, scrumdesk, github, and google doc | ** matching issues in bugzilla, scrumdesk, github, and google doc | ||
| Line 165: | Line 181: | ||
*** Follow up fullrun-2 progress and triage fullrun bugs | *** Follow up fullrun-2 progress and triage fullrun bugs | ||
|| | || | ||
* Week W40 (09/28~10/ | * Week W40 (09/28~10/02) | ||
** Follow v2.5 user story | ** Follow v2.5 user story | ||
*** L10n test case creation and review, and knowledge sharing | *** L10n test case creation and review, and knowledge sharing | ||
Latest revision as of 06:55, 5 October 2015
| Name | Done | Plan |
|---|---|---|
| Alison |
|
|
| Askeing |
|
|
| Cynthia |
|
|
| Gerry |
|
|
| Iris |
|
|
| Kinder |
|
|
| Mike |
|
|
| Paul |
|
|
| Shako Ho |
|
|
| Shing |
|
|
| Teri |
|
|
| Walter |
|
|
| William Hsu |
|
|