Unified Telemetry/Status reports/data continuity/November 4 2015: Difference between revisions
Jump to navigation
Jump to search
(new updates) |
(→Exec Summary: formatting, dates) |
||
| (5 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
=== Overall Project Health === | === Overall Project Health === | ||
This week: Green | This week: Green | ||
Last week: Green | |||
=== Project summary === | === Project summary === | ||
| Line 9: | Line 11: | ||
=== Exec Summary === | === Exec Summary === | ||
* | Project broken into 3 stages - POC/validation (11/12), handling unexpected differences (TBD), Operationalization (TBD). | ||
POC: | |||
*Executive dashboard with consolidated data set | |||
*Plot both lines, show values on roll over (and % difference) | |||
*High level metrics showing how much change is introduced in v4. For each measure, take last monthly value and have a table on the page. Explains the difference in the measures. | |||
=== Risks/Issues === | === Risks/Issues === | ||
| Line 16: | Line 23: | ||
! Description of Risks/Issues !! State !! Owner !! Plan to Resolve/Mitigation !! Target Date | ! Description of Risks/Issues !! State !! Owner !! Plan to Resolve/Mitigation !! Target Date | ||
|- | |- | ||
| V4 data validation || | | V4 data validation || Closed || Sam || Waiting for more data; blocked on V2 outage. [https://docs.google.com/document/d/1rvbCyVSzBsexer-0G7HdR_l1DczKAJdjzChxv0MjYco/ doc] || 10/10 | ||
|- | |- | ||
| Data continuity across V2/V4 || Open || Katie/Mark/Trink || [https://docs.google.com/a/mozilla.com/document/d/1VzQHfzfA-S_lO2wpXDFjDzSJntJCMwP03TzefIj7RrE/edit?usp=sharing Plan], [https://bugzilla.mozilla.org/show_bug.cgi?id=1182684 Metabug] || 11/ | | Data continuity across V2/V4 || Open || Katie/Mark/Trink || [https://docs.google.com/a/mozilla.com/document/d/1VzQHfzfA-S_lO2wpXDFjDzSJntJCMwP03TzefIj7RrE/edit?usp=sharing Plan], [https://bugzilla.mozilla.org/show_bug.cgi?id=1182684 Metabug] || 11/12 | ||
|- | |- | ||
| tracking ticket for dashboard | | tracking ticket for dashboard || in progress || Mreid, Hamilton || [https://bugzilla.mozilla.org/show_bug.cgi?id=1175583 bug] || ASAP | ||
|- | |- | ||
| [https://bugzilla.mozilla.org/show_bug.cgi?id=1175583 | | unexpected columns needs to be debugged || in progress || Mreid, Saptarshi || [https://bugzilla.mozilla.org/show_bug.cgi?id=1175583 debug] || 11/12 | ||
|- | |- | ||
|} | |} | ||
| Line 32: | Line 39: | ||
=== Planned for Next Period === | === Planned for Next Period === | ||
* Mreid to get data drop | * Mreid to get data drop | ||
* Mark to provide example roll ups to Hamilton | |||
** one set of data with fhr, one UT data - trink roll up of Saptarshi value | ** one set of data with fhr, one UT data - trink roll up of Saptarshi value | ||
** google doc with links via Mreid | ** google doc with links via Mreid | ||
Latest revision as of 18:26, 5 November 2015
Data continuity status report November 4, 2015
Overall Project Health
This week: Green
Last week: Green
Project summary
- Deliveries are the executive dashboard populated by both v2 and v4 values
- Describing explanations for why differences exist between the streams
Exec Summary
Project broken into 3 stages - POC/validation (11/12), handling unexpected differences (TBD), Operationalization (TBD).
POC:
- Executive dashboard with consolidated data set
- Plot both lines, show values on roll over (and % difference)
- High level metrics showing how much change is introduced in v4. For each measure, take last monthly value and have a table on the page. Explains the difference in the measures.
Risks/Issues
| Description of Risks/Issues | State | Owner | Plan to Resolve/Mitigation | Target Date |
|---|---|---|---|---|
| V4 data validation | Closed | Sam | Waiting for more data; blocked on V2 outage. doc | 10/10 |
| Data continuity across V2/V4 | Open | Katie/Mark/Trink | Plan, Metabug | 11/12 |
| tracking ticket for dashboard | in progress | Mreid, Hamilton | bug | ASAP |
| unexpected columns needs to be debugged | in progress | Mreid, Saptarshi | debug | 11/12 |
Accomplished for Last Period
- Mreid got required data
- tiger team assembled, roles understood, basic project outline and timing.
Planned for Next Period
- Mreid to get data drop
- Mark to provide example roll ups to Hamilton
- one set of data with fhr, one UT data - trink roll up of Saptarshi value
- google doc with links via Mreid
- Mark to provide Saptarshi examples of “bad lines” (too many / too few columns)