FirefoxOS/DeviceQA/2015-11-16WeeklyReport: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
(Created page with " Last week | Next week {| class="wikitable" class="fullwidth-table" border="1"...")
 
(MikeLien weekly update)
 
(9 intermediate revisions by 7 users not shown)
Line 16: Line 16:
||
||
* Week W46 (11/09~11/13)
* Week W46 (11/09~11/13)
** Investigate Vagrant
** Investigate apply patches and scripts for ITP
** Develop credentials error handler of TC tools
** Develop B2G flash tools
||
||
* Week W47 (11/16~11/20)
* Week W47 (11/16~11/20)
** Implement flashtool menu program of ITP
** Write ITP slides
** Develop credentials error handler of TC tools
|-
|-
| Cynthia
| Cynthia
Line 31: Line 38:
||
||
* Week W47 (11/16~11/20)
* Week W47 (11/16~11/20)
 
** Track 2.5 bugs/status
** Clarify 2.6 feature scopes
** Prepare EuroStar sharing
|-
|-
|Iris
|Iris
||
||
* Week W46 (11/09~11/13)
* Week W46 (11/09~11/13)
** [Telemetry]
*** Verify Bugs, Bug list: https://goo.gl/scA35s, no blocker
*** Create test cases on Moztrap - done
*** App Usage Regression - done
||
||
* Week W47 (11/16~11/20)
* Week W47 (11/16~11/20)
** [Telemetry]
*** Track and verify 2.5 Bugs
*** Telemetry regression
|-
|-
| Kinder
| Kinder
Line 50: Line 66:
||
||
* Week W46 (11/09~11/13)
* Week W46 (11/09~11/13)
 
** EuroSTAR training summarise
** Open Mobile sync up
** Monitor performance regression
** NSec test case creation
** Verify NSec issues
||
||
* Week W47 (11/16~11/20)
* Week W47 (11/16~11/20)
 
** EuroSTAR sharing slides creation
** Open Mobile sync up
** Monitor performance regression
** Verify NSec issues
|-
|-
| Paul
| Paul
Line 69: Line 92:
||
||
* Week W47 (11/16~11/20)
* Week W47 (11/16~11/20)
** MTBF daily operation
*** fix the email with with network domain name added
*** review gaia header fix patch
** MCTS daily operation
*** review new decency package patch


|-
|-
Line 82: Line 111:
||
||
* Week W46 (11/09~11/13)
* Week W46 (11/09~11/13)
** [V2.5] PTS
*** Discussed with Dev about investigation results
*** All issues are resolved: PTS 6.3.0 bug or configuration issues
*** Updated PTS wiki with new PTS 6.3.0 setup section
*** [https://bugzilla.mozilla.org/show_bug.cgi?id=1224106 PTS v2.5 RA meta bug] - asked Marigold to run another full run
** [V2.5] Replaceable Homescreen
*** Raised the issue of Dev late code change - [https://bugzilla.mozilla.org/show_bug.cgi?id=1218805 Bug 1218805 Implement 'edit mode']
*** Track bugs
||
||
* Week W47 (11/16~11/20)
* Week W47 (11/16~11/20)
** [V2.5] PTS
*** Review test results
** [V2.5] Replaceable Homescreen
*** Modify [https://moztrap.mozilla.org/manage/cases/?pagenumber=1&pagesize=20&sortfield=created_on&sortdirection=desc&filter-tag=3591 moztrap test cases] to reflect latest design change
*** Run tests for new edit mode change
** [V2.6]
*** Study Pin the web and Control Center
|-
|-
| Walter
| Walter
||
||
* Week W46 (11/09~11/13)
* Week W46 (11/09~11/13)
** Ran v2.5 MCTS
** EuroSTAR presentation discussion
** Compensated Leave on monday
||
||
* Week W47 (11/16~11/20)
* Week W47 (11/16~11/20)
** Ran v2.5 MCTS for an overview
*** generate golden image
*** solve webapi test related issues
** MCTS report
|-
|-


Line 95: Line 146:
||
||
* Week W46 (11/09~11/13)
* Week W46 (11/09~11/13)
** v2.5 user story
*** RTL test progress follow-up and bug triage
**** Meeting Minute: http://bit.ly/1j6P953
**** Bug list/triage: https://goo.gl/bHRETe
*** L10n test progress follow-up
*** Configure 2.5 Gaia UI test Jobs by following bitbar settings
*** Jenkins maintenance (Making sure all high priority jobs are stable)
**** http://10.247.120.17:8080/
** [Outsourcing]
*** 2015 Q4 task discussion
*** Marigold weekly report (https://goo.gl/XIQ2fy)
*** v2.5 task assignment
**** https://goo.gl/UL7cgT
*** Tracing Marigold working model and process


||
||
* Week W47 (11/16~11/20)
* Week W47 (11/16~11/20)
** v2.5 user story
*** RTL test progress follow-up and bug triage
**** Meeting Minute: http://bit.ly/1j6P953
**** Bug list/triage: https://goo.gl/bHRETe
*** L10n test task assignment
*** Configure 2.5 Gaia UI test Jobs by following bitbar settings
** [Outsourcing]
*** 2015 Q4 task discussion
*** Marigold weekly report (https://goo.gl/XIQ2fy)
*** v2.5 task assignment
**** https://goo.gl/UL7cgT
*** Tracing Marigold working model and process


|-
|-
|}
|}

Latest revision as of 08:15, 17 November 2015

Last week | Next week

Name Done Plan
Alison
  • Week W46 (11/09~11/13)
  • Week W47 (11/16~11/20)
Askeing
  • Week W46 (11/09~11/13)
    • Investigate Vagrant
    • Investigate apply patches and scripts for ITP
    • Develop credentials error handler of TC tools
    • Develop B2G flash tools
  • Week W47 (11/16~11/20)
    • Implement flashtool menu program of ITP
    • Write ITP slides
    • Develop credentials error handler of TC tools
Cynthia
  • Week W46 (11/09~11/13)
  • Week W47 (11/16~11/20)
Gerry
  • Week W46 (11/09~11/13)
  • Week W47 (11/16~11/20)
    • Track 2.5 bugs/status
    • Clarify 2.6 feature scopes
    • Prepare EuroStar sharing
Iris
  • Week W46 (11/09~11/13)
    • [Telemetry]
      • Verify Bugs, Bug list: https://goo.gl/scA35s, no blocker
      • Create test cases on Moztrap - done
      • App Usage Regression - done
  • Week W47 (11/16~11/20)
    • [Telemetry]
      • Track and verify 2.5 Bugs
      • Telemetry regression
Kinder
  • Week W46 (11/09~11/13)
  • Week W47 (11/16~11/20)
Mike
  • Week W46 (11/09~11/13)
    • EuroSTAR training summarise
    • Open Mobile sync up
    • Monitor performance regression
    • NSec test case creation
    • Verify NSec issues
  • Week W47 (11/16~11/20)
    • EuroSTAR sharing slides creation
    • Open Mobile sync up
    • Monitor performance regression
    • Verify NSec issues
Paul
  • Week W46 (11/09~11/13)
  • Week W47 (11/16~11/20)
Shako Ho
  • Week W46 (11/09~11/13)
  • Week W47 (11/16~11/20)
    • MTBF daily operation
      • fix the email with with network domain name added
      • review gaia header fix patch
    • MCTS daily operation
      • review new decency package patch
Shing
  • Week W46 (11/09~11/13)
  • Week W47 (11/16~11/20)
Teri
  • Week W46 (11/09~11/13)
    • [V2.5] PTS
      • Discussed with Dev about investigation results
      • All issues are resolved: PTS 6.3.0 bug or configuration issues
      • Updated PTS wiki with new PTS 6.3.0 setup section
      • PTS v2.5 RA meta bug - asked Marigold to run another full run
    • [V2.5] Replaceable Homescreen
  • Week W47 (11/16~11/20)
    • [V2.5] PTS
      • Review test results
    • [V2.5] Replaceable Homescreen
      • Modify moztrap test cases to reflect latest design change
      • Run tests for new edit mode change
    • [V2.6]
      • Study Pin the web and Control Center
Walter
  • Week W46 (11/09~11/13)
    • Ran v2.5 MCTS
    • EuroSTAR presentation discussion
    • Compensated Leave on monday
  • Week W47 (11/16~11/20)
    • Ran v2.5 MCTS for an overview
      • generate golden image
      • solve webapi test related issues
    • MCTS report
William Hsu