Platform/2015-Q1-Goals: Difference between revisions
< Platform
Jump to navigation
Jump to search
(→Input: add tentative, high level sumo goals) |
(→General Goals (by Team): rework Input goals to be more 2015q1 timeframe-ish) |
||
| Line 30: | Line 30: | ||
==== Input ==== | ==== Input ==== | ||
* | * Upgrade to Django 1.7 | ||
* | * Upgrade other libraries to appropriate versions now that Input is on Python 2.7 | ||
* 12-factor app work ([[Firefox/Input/12 Factor App|12 Factor App]]) | |||
* Prepare for AWS move (set up a stage environment in AWS?) | |||
* 1-5 gradient ratings ([[Firefox/Input/Gradient Sentiment|Gradient Sentiment]]) | |||
* Thank you page overhaul ([[Firefox/Input/Thank you page|Thank you page]]) (via OPW intern) | |||
=== Release Engineering / Release Operations / Developer Services === | === Release Engineering / Release Operations / Developer Services === | ||
Revision as of 15:50, 21 December 2014
Platform
General Goals (by Team)
GFX
Layout
Media
DOM
JS
Accessibility
Perf
Networking
Mobile
A*Team
QA
Web Engineering
crash-stats
DXR
SUMO
Input
- Upgrade to Django 1.7
- Upgrade other libraries to appropriate versions now that Input is on Python 2.7
- 12-factor app work (12 Factor App)
- Prepare for AWS move (set up a stage environment in AWS?)
- 1-5 gradient ratings (Gradient Sentiment)
- Thank you page overhaul (Thank you page) (via OPW intern)
Release Engineering / Release Operations / Developer Services
- Virtualize Windows builders and get builds running in the cloud
- Drive some of our builds out of taskcluster
- Schedule reduced test load (depends on A-team)
- Ship production quality 1.0 of MozReview and Autoland
- Scope and begin implementation of release automation changes with the goal to cut release time in half.
- Support OS X 10.10 builds with minimum additional cost