Breakpad/Status Meetings/2011-Jan-19: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
Line 14: Line 14:
* Smoke Test
* Smoke Test
** Test plan [rhelmer] [https://wiki.mozilla.org/Socorro/Pre-PHX_Smoketest_Schedule schedule]
** Test plan [rhelmer] [https://wiki.mozilla.org/Socorro/Pre-PHX_Smoketest_Schedule schedule]
** Can we now test with loaded HBase?
** When to run component failure/failover tests?


* HBase
* HBase
** Daniel/X to update
** [https://wiki.mozilla.org/Socorro:HBaseDataMigration Hbase specific steps]  
** [https://wiki.mozilla.org/Socorro:HBaseDataMigration Hbase specific steps]  
** Sync: exact plans please
*** Are we doing another full sync before Sat?  (Thursday night was orig plan)
*** SJC ->SCL2???


* Postgres
* Postgres
** Josh update
* Network issues
** What are we going with?  What do we still need from netops?
** How will we test this?

Revision as of 20:49, 19 January 2011

1.7.6

  • canceled for SJC production

1.7.5.6

Introduced to resolve fallback trouble during HBase downtime

  • bug 626328 - collectors can fail to send to disk
  • lead to discovery of
    • bug 626944 - hbaseResubmit cron missing on two collectors
    • bug 627028 - IT set up missing cron on two collectors
      • discussion of ramifications of introducing old crashes now

Migration

the plan and the checklist

  • Smoke Test
    • Test plan [rhelmer] schedule
    • Can we now test with loaded HBase?
    • When to run component failure/failover tests?
  • HBase
    • Daniel/X to update
    • Hbase specific steps
    • Sync: exact plans please
      • Are we doing another full sync before Sat? (Thursday night was orig plan)
      • SJC ->SCL2???
  • Postgres
    • Josh update
  • Network issues
    • What are we going with? What do we still need from netops?
    • How will we test this?