Breakpad/Status Meetings/2011-Jan-19: Difference between revisions
< Breakpad | Status Meetings
Jump to navigation
Jump to search
| Line 14: | Line 14: | ||
* Smoke Test | * Smoke Test | ||
** Test plan [rhelmer] [https://wiki.mozilla.org/Socorro/Pre-PHX_Smoketest_Schedule schedule] | ** Test plan [rhelmer] [https://wiki.mozilla.org/Socorro/Pre-PHX_Smoketest_Schedule schedule] | ||
** Can we now test with loaded HBase? | |||
** When to run component failure/failover tests? | |||
* HBase | * HBase | ||
** Daniel/X to update | |||
** [https://wiki.mozilla.org/Socorro:HBaseDataMigration Hbase specific steps] | ** [https://wiki.mozilla.org/Socorro:HBaseDataMigration Hbase specific steps] | ||
** Sync: exact plans please | |||
*** Are we doing another full sync before Sat? (Thursday night was orig plan) | |||
*** SJC ->SCL2??? | |||
* Postgres | * Postgres | ||
** Josh update | |||
* Network issues | |||
** What are we going with? What do we still need from netops? | |||
** How will we test this? | |||
Revision as of 20:49, 19 January 2011
1.7.6
- canceled for SJC production
1.7.5.6
Introduced to resolve fallback trouble during HBase downtime
- bug 626328 - collectors can fail to send to disk
- lead to discovery of
- bug 626944 - hbaseResubmit cron missing on two collectors
- bug 627028 - IT set up missing cron on two collectors
- discussion of ramifications of introducing old crashes now
Migration
- Smoke Test
- Test plan [rhelmer] schedule
- Can we now test with loaded HBase?
- When to run component failure/failover tests?
- HBase
- Daniel/X to update
- Hbase specific steps
- Sync: exact plans please
- Are we doing another full sync before Sat? (Thursday night was orig plan)
- SJC ->SCL2???
- Postgres
- Josh update
- Network issues
- What are we going with? What do we still need from netops?
- How will we test this?