Breakpad/Status Meetings/2011-June-22: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
(Created page with "= 2.0 = * Ship status ** Possible ship tomorrow, 6/23. Next possible date Tuesday 6/28, without laura or rhelmer (lars + jabba driving) ** QA - mbrandt ** {{bug|665522}} ** Metr...")
 
Line 6: Line 6:
** Metrics: boxes for production ES?  When will this be ready to go
** Metrics: boxes for production ES?  When will this be ready to go
** Suggest shipping with PG version preffed on and flipping the switch when these issues are resolved
** Suggest shipping with PG version preffed on and flipping the switch when these issues are resolved
** jabba says need the pgbouncer issue resolved in staging


= Other issues =
= Other issues =

Revision as of 17:46, 22 June 2011

2.0

  • Ship status
    • Possible ship tomorrow, 6/23. Next possible date Tuesday 6/28, without laura or rhelmer (lars + jabba driving)
    • QA - mbrandt
    • bug 665522
    • Metrics: boxes for production ES? When will this be ready to go
    • Suggest shipping with PG version preffed on and flipping the switch when these issues are resolved
    • jabba says need the pgbouncer issue resolved in staging

Other issues

  • Have had some discussions this week, and so far Q3 looks like:
    • Move to github
    • Config changes only release
    • TCBS -> ES
    • Tasks as listed by KaiRo, elevating reports (largely converting to ES), UI changes, etc.
  • Beyond 2.0, users will need ElasticSearch, although some may choose to use this with PostgreSQL.