Task Continuity Description: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
(Initial data entered)
(template)
Line 1: Line 1:
'''Description:''' <br />
<div style="float: right; margin: 0px 0px 10px 25px;">[[File:Fxossmall.png|link=]]</div>
Task Continuity or "Seamless Experience" provides a grea opportunity to have a better experience on the web. It consists of 3 themes: Share, Continuity, and Control. Based on these themes, the user will be able to enjoy and share web content across multiple devices.  


'''Requirements:'''<br />
=='''Program Description'''==
* [https://docs.google.com/spreadsheets/d/11ps9cyQleLiAGDcKlf4-YnNN2WzIbzH37DH-ePx3D_4/edit#gid=351414096 Task Continuity Ideation]<br />
Enter text here
* [https://mozilla.app.box.com/s/kzmfmcs7eiredmm9qp2xziogaioegb2j Day in the life Presentation]


'''Product Owner:''' Vishwanathan Krishnamoorthy
===Product Requirements:===
Enter text here


'''Program Manager:''' Michael Treese
===User Stories and Acceptance Criteria===
{| class="wikitable"
! style="text-align: center;" | Title
! style="text-align: center;" | BUG ID
! style="text-align: center;" | User story
! style="text-align: center;" | Acceptance Criteria
|-
| rowspan="2" | Title Goes Here
| [https://bugzilla.mozilla.org/show_bug.cgi?id=1180659 Bug ID]
| User Story 1
| Acceptance Criteria 1
|-
| [https://bugzilla.mozilla.org/show_bug.cgi?id=1180659 Bug ID]
| User Story 2
| Acceptance Criteria 2
|-
| rowspan="1" | Help/Onboarding
| [https://bugzilla.mozilla.org/show_bug.cgi?id=1180659 Bug ID]
| User Story 3
| Acceptance Criteria 3
|}


'''Timeline:''' <br />
=='''Program Status'''==
Currently in Ideation. The next milestone is to meet with Chris Beard and present the concepts developed by the team.
{| class="wikitable"
! style="text-align: center;" | Milestone
! style="text-align: center;" | Date
! style="text-align: center;" | Status
|-
| Milestone 1
|
! style="background:#00EC00;" | ON TARGET
|-
| Milestone 2
|
! style="background:#FFFF00;" | CHALLENGED
|-
| Milestone 3
|
! style="background:#FF2800;" | AT RISK
|}


'''Etherpad:''' [https://etherpad.mozilla.org/FXOS-20P2P-20V3 Task Continuity]
'''Status Key'''
{| class="wikitable"
! style="text-align: center;" | Color
! style="text-align: center;" | Status
! style="text-align: center;" | Key
|-
! style="background:#00EC00;" |
| On Target
| The project or deliverable is expected to meet its due date.
|-
! style="background:#FFFF00;" | 
| Challenged
| The project or deliverable is facing an issue that might cause it to miss its due date, but a “get well” plan has been developed to get it back on track.
|-
! style="background:#FF2800;" |
| At Risk or Late
| The project or deliverable is blocked or facing an issue that might cause it to miss its due date, and there’s no “get well” plan to get it back on track, or it is already late.
|-
! style="background:#00B2FF;" |
| Done
| The project or deliverable has been completed.
|-
! style="background:#C1C6CA;" |
| On Hold
| The project or deliverable has been placed on hold.
|}
 
----
 
=='''Program Timeline'''==
[[File:Release Timeline.png]]
 
----
 
=='''MVP Scope'''==
 
Querying by 2.6+ features
 
(please add correct bug tracking number)
<bugzilla>
    {
        "blocks":"1188667",
        "cf_feature_b2g":"2.6+",
        "status":["NEW","REOPENED","UNCONFIRMED","ASSIGNED","RESOLVED","VERIFIED","CLOSED"],
        "include_fields": "id, summary, status, target_milestone, resolution, assigned_to, depends_on, blocks, whiteboard, cf_feature_b2g"
    }
</bugzilla>
 
----
 
=='''Dependency Tracking'''==
[[File:Dependency Gantt Chart.png]]
 
----
 
=='''Detailed Program Plan'''==
 
{| class="wikitable"
! style="text-align: center;" | Action Item
! style="text-align: center;" | Engineering Owner
! style="text-align: center;" | QA Owner
! style="text-align: center;" | UX Owner
! style="text-align: center;" | Bugzilla ID
! style="text-align: center;" | Planned Done
! style="text-align: center;" | Actual Done
|-
|
|
|
|
|
|
|
|-
|
|
|
|
|
|
|
|-
|
|
|
|
|
|
|
|-
|
|
|
|
|
|
|
|}
 
----
 
=='''Program Stakeholders'''==
 
{| class="wikitable"
! style="text-align: center;" | Role
! style="text-align: center;" | Name
! style="text-align: center;" | IRC
|-
| EPM
|
|
|-
| EM
|
|
|-
| TL
|
|
|-
| UX
|
|
|-
| QA
|
|
|}
 
*EPM = Engineering Program Manager
*EM = Engineering Manager
*TL = Tech Lead
*UX = User Experience
 
----
 
==Reference Links==

Revision as of 02:06, 14 October 2015

Fxossmall.png

Program Description

Enter text here

Product Requirements:

Enter text here

User Stories and Acceptance Criteria

Title BUG ID User story Acceptance Criteria
Title Goes Here Bug ID User Story 1 Acceptance Criteria 1
Bug ID User Story 2 Acceptance Criteria 2
Help/Onboarding Bug ID User Story 3 Acceptance Criteria 3

Program Status

Milestone Date Status
Milestone 1 ON TARGET
Milestone 2 CHALLENGED
Milestone 3 AT RISK

Status Key

Color Status Key
On Target The project or deliverable is expected to meet its due date.
Challenged The project or deliverable is facing an issue that might cause it to miss its due date, but a “get well” plan has been developed to get it back on track.
At Risk or Late The project or deliverable is blocked or facing an issue that might cause it to miss its due date, and there’s no “get well” plan to get it back on track, or it is already late.
Done The project or deliverable has been completed.
On Hold The project or deliverable has been placed on hold.

Program Timeline

Release Timeline.png


MVP Scope

Querying by 2.6+ features

(please add correct bug tracking number)

No results.

0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);



Dependency Tracking

Dependency Gantt Chart.png


Detailed Program Plan

Action Item Engineering Owner QA Owner UX Owner Bugzilla ID Planned Done Actual Done

Program Stakeholders

Role Name IRC
EPM
EM
TL
UX
QA
  • EPM = Engineering Program Manager
  • EM = Engineering Manager
  • TL = Tech Lead
  • UX = User Experience

Reference Links