=== Exec Summary ===
=== Exec Summary ===
Project broken into 3 stages - POC/validation, handling unexpected differences, Operationalization.
Project broken into 3 stages - POC/validation (11/12), handling unexpected differences (TBD), Operationalization (TBD).


POC:
POC:
** Executive dashboard with consolidated data set
*Executive dashboard with consolidated data set
** Plot both lines, show values on roll over (and % difference)
*Plot both lines, show values on roll over (and % difference)
** High level metrics showing how much change is introduced in v4. For each measure, take last monthly value and have a table on the page. Explains the difference in the measures.
*High level metrics showing how much change is introduced in v4. For each measure, take last monthly value and have a table on the page. Explains the difference in the measures.


=== Risks/Issues ===
=== Risks/Issues ===