Web Components Performance: Difference between revisions
Jump to navigation
Jump to search
(Created page with "<div style="float: right; margin: 0px 0px 10px 25px;">link=</div> =='''Program Description'''== === Product Requirements:=== ===User Stories and Acc...") |
|||
| Line 159: | Line 159: | ||
| ENG | | ENG | ||
| Etienne Segonzac | | Etienne Segonzac | ||
| | | etienne | ||
|- | |- | ||
| ENG | | ENG | ||
| Thinker Lee | | Thinker Lee | ||
| | | thinker | ||
|- | |- | ||
| ENG | | ENG | ||
| Line 171: | Line 171: | ||
| ENG | | ENG | ||
| KanRu Chen | | KanRu Chen | ||
| | | kanru | ||
|- | |- | ||
| UX | | UX | ||
| Tina Hsieh | | Tina Hsieh | ||
| | | Tina_Hsieh | ||
|- | |- | ||
| UX | | UX | ||
| Helen Huang | | Helen Huang | ||
| | | hhuang | ||
|- | |||
| QA | |||
| Mike Lien | |||
| mlien | |||
|- | |- | ||
| QA | | QA | ||
| Isabel Rios | | Isabel Rios | ||
| isabel_rios | | isabel_rios | ||
|} | |} | ||
Latest revision as of 19:01, 4 December 2015

Program Description
Product Requirements:
User Stories and Acceptance Criteria
Meta tracking the Web Component Performance effort Bug 1219559
Program Status
| Milestone | Date | Status |
|---|---|---|
| Milestone 1 | ON TARGET | |
| Milestone 2 | CHALLENGED | |
| Milestone 3 | AT RISK |
Status Key
| Color | Status | Key |
|---|---|---|
| On Target | The project or deliverable is expected to meet its due date. | |
| Challenged | The project or deliverable is facing an issue that might cause it to miss its due date, but a “get well” plan has been developed to get it back on track. | |
| At Risk or Late | The project or deliverable is blocked or facing an issue that might cause it to miss its due date, and there’s no “get well” plan to get it back on track, or it is already late. | |
| Done | The project or deliverable has been completed. | |
| On Hold | The project or deliverable has been placed on hold. |
Program Timeline
MVP Scope
Querying by 2.6+ features
(please add correct bug tracking number)
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
Dependency Tracking
Detailed Program Plan
| Action Item | Engineering Owner | QA Owner | UX Owner | Bugzilla ID | Planned Done | Actual Done |
|---|---|---|---|---|---|---|
Program Stakeholders
| Role | Name | IRC |
|---|---|---|
| EPM | Maria Oteo | mariaoteo |
| EPM | Bobby Chien | bchien |
| EM | Francisco Jordano | francisco |
| PM | Ravikumar Dandu | |
| TL | ||
| ENG | Etienne Segonzac | etienne |
| ENG | Thinker Lee | thinker |
| ENG | Greg Weng | |
| ENG | KanRu Chen | kanru |
| UX | Tina Hsieh | Tina_Hsieh |
| UX | Helen Huang | hhuang |
| QA | Mike Lien | mlien |
| QA | Isabel Rios | isabel_rios |
- EPM = Engineering Program Manager
- EM = Engineering Manager
- PM = Product Manager
- TL = Tech Lead
- UX = User Experience
- QA = Quality Assurance

