The goal | The goal is to migrate emulator from current ICS version to x86-KK version. This project wiki hasn't been updated since the Firefox OS for smartphones sunset. | ||
===Requirements:=== | ===Requirements:=== | ||
Latest revision as of 21:44, 12 July 2016

Project Description
The goal is to migrate emulator from current ICS version to x86-KK version. This project wiki hasn't been updated since the Firefox OS for smartphones sunset.
Requirements:
- Emulator-x86-KK Local build ready
- Enable Emulator-x86-KK on treeherder
- Fix all failed test cases
Program Status
| Milestone | Date | Status |
|---|---|---|
| Emulator-x86-KK Local build ready | 2015-06-25 | ON TARGET |
| Enable Emulator-x86-KK on treeherder | 2015-06-25 | ON TARGET |
| Fix all failed test cases | TBD | CHALLENGED |
Status Key
| Color | Status | Key |
|---|---|---|
| On Target | The project or deliverable is expected to meet its due date. | |
| Challenged | The project or deliverable is facing an issue that might cause it to miss its due date, but a “get well” plan has been developed to get it back on track. | |
| At Risk or Late | The project or deliverable is blocked or facing an issue that might cause it to miss its due date, and there’s no “get well” plan to get it back on track, or it is already late. | |
| Done | The project or deliverable has been completed. | |
| On Hold | The project or deliverable has been placed on hold. |
Program Timeline
MVP Scope
Meta: Bug 1144970 - (emu-x86-kk-tests) [meta] Enable emulator-x86-kk and tests on treeherder/TaskCluster
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
Dependency Tracking
Detailed Program Plan
| Action Item | Engineering Owner | QA Owner | UX Owner | Bugzilla ID | Planned Done | Actual Done |
|---|---|---|---|---|---|---|
Program Stakeholders
| Role | Name | IRC |
|---|---|---|
| EPM | ||
| EM | ||
| PM | ||
| TL | ||
| UX | ||
| QA |
- EPM = Engineering Program Manager
- EM = Engineering Manager
- PM = Product Manager
- TL = Tech Lead
- UX = User Experience