QA/Use a separate content process for file:// URLs: Difference between revisions

Line 383: Line 383:


= Sign off =
= Sign off =
== Criteria ==
== Criteria for Mid Nightly ==
Check list
* All the smoke tests (designed to ensure the main functionality is working as expected) are executed.
 
== Criteria for Pre-Beta Release and Pre-Release ==
Check list
Check list
* All test cases should be executed
* All test cases should be executed
* Has sufficient automated test coverage (as measured by code coverage tools) - coordinate with RelMan
* All blockers, criticals must be fixed and verified or have an agreed-upon timeline for being fixed (as determined by engineering/RelMan/QA)
* All blockers, criticals must be fixed and verified or have an agreed-upon timeline for being fixed (as determined by engineering/RelMan/QA)


Confirmed users
1,333

edits