=== The Revamp  ===
=== The Revamp  ===


Items for consideration (time estimates to come) that should be completed by late February.
Items for consideration (time estimates to come) that should be completed by late February  


*The domain name structure
'''Format: '''['''due date] '''task''' ('''comment''')
*The sites core functionality  
 
*The content overhaul and creation  
*[22/11/10] The sites core functionality (ie. the bare minimum)<br>
*Theme tweaks [not redesign, just minor tweaks]
*[29/11/10] The domain name structure (recommended:&nbsp;[[Websites/Taskforce/Proposals/Domain_Name_Strategy|following Mozilla]] on this one)<br>
*Community map [where people are within the UK]  
*[13/12/10] The content overhaul and creation (already started)
*Events calendar [for Mozilla events primarily then relevant events after]  
*[03/01/11] Theme tweaks (not redesign, just minor tweaks)
*Site downtime and what to do with it during the revamp.
*[10/01/11] Site downtime (a maintainance page should also be created for this task)
*Face-to-face meetup before relaunch.
*[24/01/11] Impliment changes (all of them, not just some)
*[31/01/11] Relaunch site! (Yay!)
*[02/11] Face-to-face meetup to work out long term plan (Double yay!)
 
 
 
The plan for completing these should follow loosely with the unix philosophy of doing one thing and doing it well. So we should do one task, do it well, then move to the next while taking the results of the previous into account.

Revision as of 18:34, 16 November 2010

What is The Mozilla UK Community Portal?

The Mozilla UK community portal was designed to bring the UK community together in a central place. Feel free to post feed back in our forums and get involved!

You can also visit the beta version of the site by visiting www.mozilla-uk.org

Community Roadmap

The Revamp

Items for consideration (time estimates to come) that should be completed by late February

Format: [due date] task (comment)

  • [22/11/10] The sites core functionality (ie. the bare minimum)
  • [29/11/10] The domain name structure (recommended: following Mozilla on this one)
  • [13/12/10] The content overhaul and creation (already started)
  • [03/01/11] Theme tweaks (not redesign, just minor tweaks)
  • [10/01/11] Site downtime (a maintainance page should also be created for this task)
  • [24/01/11] Impliment changes (all of them, not just some)
  • [31/01/11] Relaunch site! (Yay!)
  • [02/11] Face-to-face meetup to work out long term plan (Double yay!)


The plan for completing these should follow loosely with the unix philosophy of doing one thing and doing it well. So we should do one task, do it well, then move to the next while taking the results of the previous into account.