Mobile/Notes/02-Feb-2011: Difference between revisions
Jump to navigation
Jump to search
(→QA) |
|||
| Line 43: | Line 43: | ||
== Release Engineering == | == Release Engineering == | ||
* tegras | |||
** stabilized | |||
** 2 talos suites in production | |||
** we have 3 more talos suites green in staging that we'll be bringing live shortly | |||
** once this is done, we'll work on unit tests + other talos suites | |||
* n900 tp4 live | |||
** This was green in staging, then we had a bit of a snafu putting it into production. Now tp4 (chrome) is orange, but nochrome is green. | |||
== QA == | == QA == | ||
Revision as of 17:18, 2 February 2011
Details
- Wednesdays - 9:30am Pacific, 12:30pm Eastern, 16:30 UTC
- 650-903-0800 or 650-215-1282 x92 Conf# 8605 (US/INTL)
- 1-800-707-2533 (pin 369) Conf# 8605 (US)
- irc.mozilla.org #mobile for backchannel
Schedule
Major Topics for This Week
Front-end
UX design
Maemo
Qt
Android
Electrolysis
General Platform
Video
Camera
Plugins
Performance
Networking
Graphics
Startup
Layout
Content
Release Engineering
- tegras
- stabilized
- 2 talos suites in production
- we have 3 more talos suites green in staging that we'll be bringing live shortly
- once this is done, we'll work on unit tests + other talos suites
- n900 tp4 live
- This was green in staging, then we had a bit of a snafu putting it into production. Now tp4 (chrome) is orange, but nochrome is green.