Breakpad/Status Meetings/2011-July-20: Difference between revisions
< Breakpad | Status Meetings
Jump to navigation
Jump to search
(Created page with "= 2.1 = * [https://bugzilla.mozilla.org/buglist.cgi?classification=Server%20Software&component=Socorro&product=Webtools&query_format=advanced&target_milestone=2.1&order=resolutio...") |
(→ES) |
||
| Line 15: | Line 15: | ||
= ES = | = ES = | ||
*Status as per plan (dre): | *Status as per plan (dre): | ||
** light up prod ES boxes - | ** light up prod ES boxes - by July 22. Now 3 machines. | ||
** turn on two processors, watch perf for 24 hours - sometime in test period, before July 15 | ** turn on two processors, watch perf for 24 hours - sometime in test period, before July 15 | ||
** turn on rest of processors, watch for another 2-3 days | ** turn on rest of processors, watch for another 2-3 days | ||
** backfill data - run manually once all processors switched over | ** backfill data - run manually once all processors switched over | ||
** turn on webapp - aim for by 22nd, long window by the end of the month | ** turn on webapp - aim for by 22nd, long window by the end of the month | ||
= Other issues = | = Other issues = | ||
Latest revision as of 18:27, 20 July 2011
2.1
- bugs
- Are we now ready to freeze?
2.2
- Note: despite 2.1 drifting out, 2.2 CANNOT BE LATER
- [1] - needs trimming
- Please start on your bugs! Any questions about them?
- Note that bugs that are NOT P1 blockers are all ridealongs, we won't block ship on them.
- Timeline
- Needed for Fx6 final beta
- Hard Freeze by 8/4
- Hard Ship by 8/11
ES
- Status as per plan (dre):
- light up prod ES boxes - by July 22. Now 3 machines.
- turn on two processors, watch perf for 24 hours - sometime in test period, before July 15
- turn on rest of processors, watch for another 2-3 days
- backfill data - run manually once all processors switched over
- turn on webapp - aim for by 22nd, long window by the end of the month