(Created page with "= 2.1 = * [https://bugzilla.mozilla.org/buglist.cgi?classification=Server%20Software&component=Socorro&product=Webtools&query_format=advanced&target_milestone=2.1&order=resolutio...")
 
 
Line 15: Line 15:
= ES =
= ES =
*Status as per plan (dre):
*Status as per plan (dre):
** light up prod ES boxes - was by July 15 - now TBD, another week? Hardware problems.
** light up prod ES boxes - by July 22.  Now 3 machines.
** turn on two processors, watch perf for 24 hours - sometime in test period, before July 15
** turn on two processors, watch perf for 24 hours - sometime in test period, before July 15
** turn on rest of processors, watch for another 2-3 days
** turn on rest of processors, watch for another 2-3 days
** backfill data - run manually once all processors switched over
** backfill data - run manually once all processors switched over
** turn on webapp - aim for by 22nd, long window by the end of the month  
** turn on webapp - aim for by 22nd, long window by the end of the month


= Other issues =
= Other issues =

Latest revision as of 18:27, 20 July 2011

2.1

  • bugs
  • Are we now ready to freeze?

2.2

  • Note: despite 2.1 drifting out, 2.2 CANNOT BE LATER
  • [1] - needs trimming
  • Please start on your bugs! Any questions about them?
  • Note that bugs that are NOT P1 blockers are all ridealongs, we won't block ship on them.
  • Timeline
    • Needed for Fx6 final beta
    • Hard Freeze by 8/4
    • Hard Ship by 8/11

ES

  • Status as per plan (dre):
    • light up prod ES boxes - by July 22. Now 3 machines.
    • turn on two processors, watch perf for 24 hours - sometime in test period, before July 15
    • turn on rest of processors, watch for another 2-3 days
    • backfill data - run manually once all processors switched over
    • turn on webapp - aim for by 22nd, long window by the end of the month