Electrolysis/Short-Term Goals

From MozillaWiki
Jump to navigation Jump to search

Current Goals

Deploy Dynamic Analysis to mozilla-central

Followup to the initial dynamic analaysis goal: clean up the patch that is written, write some simple testcases to ensure correct behavior, and land the analysis to mozilla-central debug builds (off by default).

Owner: Drew Willcoxon
Goal date: 14-July
Status: Patches reviewed, revisions ongoing
Bug: bug 666713

Make basic Firefox navigation use the Message Manager

In order to make the dynamic analysis useful for estimating Firefox frontend work, we need basic page navigation to not produce any warnings. This means that current uses of web progress listeners in the Firefox frontend should be ported to the message manager.

It is ok for this goal to ifdef out certain features (such as aero tab previews) which are known not to work and are not essential to running mochitests.

Owner: Felipe Gomes Goal date: 21-July Status: in progress

Static Analysis of Chrome/Content Interaction

Parallel to the dynamic analysis, we need to be able to statically identify code patterns which may require rewriting (mainly in long-tail extensions). This will be an ongoing project, but we need to set intermediate goals (obvious patterns that we should start flagging). Refinement will depend on analysis gathered in the dynamic phase. bug 675014

Owner: Dave Herman

Subgoal 1: Write Testcase code

Write some testcase extensions which the tool must analyze.

Goal date: 23-June Status: incomplete, in trouble

Subgoal 2: Analyze and produce reports on one bad pattern

Goal date: 7-July

Extension Usage Metrics

Identify which extensions must be compatible with content processes in order to reach 80% of Firefox users.

Owner: smooney Goal Date: 7-July

Write Session-Restore Plan

Publish a plan to revise session-restore for multiple content processes.

Owner: jez Goal Date: 4-August

Accessibility Tuning

Fix a couple bugs found during the initial a11y hookup and do QA to identify remaining problems.

Owner: dbolter Goal Date: 11-August

Deploy a Responsiveness Metric

Deploy a responsiveness metric which measures the average and maximum time away from the event loop.

Owner: Ted Mielczarek Goal Date: 25-August

Completed Goals

Dynamic Instrumentation for Chrome/Content Interaction

We want to identify:

  • non message-manager scripts
  • which touch a "content object"
  • or implement nsIWebProgressListener

Definitions:

Non message-manager script is any chrome script that isn't run through nsIChromeFrameMessageManager.loadFrameScript.

Content objects are at least the following:

  • Any DOM object (window, document, or node)
  • Docshell or docshell derivative
  • nsIWebProgress
  • nsIDOMWindowUtils

Owner: Drew Willcoxon Goal date: 30-June Status: DONE (patch and initial analysis complete)

Identify Work Items for Multiple Content Processes

We have identified multiple content processes as a requirement for desktop Firefox. Identify and find owners for the work required for multiple content processes.

Owner: Benjamin Smedberg Goal Date: 23-June Status: DONE (feature bugs filed... memory analysis will be later)

Accessibility Engineering Plan

Identify whether the accessibility tree will need to be mirrored, or whether accessibility tools can work directly with trees in content processes.

Owner: David Bolter Goal Date: 7-July Status: DONE (posted to mozilla.dev.planning)

Developer Tools Engineering Plan

Identify how existing in-product developer tools will be made compatible with content processes and what additional platform support is required. DOM Inspector will almost certainly require some additional platform support.

Owner: Rob Campbell Goal Date: 7-July Status: DONE (posted to mozilla.dev.planning)

Get Firefox Starting Up

Get Firefox to start up and browse, so that the accessibility, devtools, and perhaps Jetpack SDK teams can work on dependencies.

Owner: Felipe Gomes Goal date: 23-June (Wednesday) Status: done

Connect the chrome/content accessibility tree on Windows

Implement the basic a11y plan on Windows with a hidden HWND and a connected cross-process a11y tree.

Owner: Alexander Surkov Goal date: 21-July Status: done