Performance Description

Revision as of 09:43, 11 November 2015 by Bobbychien (talk | contribs) (→‎MVP Scope: Update)
Fxossmall.png

Program Description

Enter text here

Product Requirements:

Enter text here

User Stories and Acceptance Criteria

Title BUG ID User story Acceptance Criteria
Title Goes Here Bug ID User Story 1 Acceptance Criteria 1
Bug ID User Story 2 Acceptance Criteria 2
Help/Onboarding Bug ID User Story 3 Acceptance Criteria 3

Program Status

Milestone Date Status
Milestone 1 ON TARGET
Milestone 2 CHALLENGED
Milestone 3 AT RISK

Status Key

Color Status Key
On Target The project or deliverable is expected to meet its due date.
Challenged The project or deliverable is facing an issue that might cause it to miss its due date, but a “get well” plan has been developed to get it back on track.
At Risk or Late The project or deliverable is blocked or facing an issue that might cause it to miss its due date, and there’s no “get well” plan to get it back on track, or it is already late.
Done The project or deliverable has been completed.
On Hold The project or deliverable has been placed on hold.

Program Timeline

 


MVP Scope

Querying by 2.6+ features

(please add correct bug tracking number)

Full Query
ID Summary Status Target milestone Resolution Assigned to Depends on Blocks Whiteboard Feature b2g
1224472 [Meta] Raptor Activation on Treeherder RESOLVED --- WONTFIX 1230457 1133421 2.6+

1 Total; 0 Open (0%); 1 Resolved (100%); 0 Verified (0%);



Dependency Tracking

 


Detailed Program Plan

Action Item Engineering Owner QA Owner UX Owner Bugzilla ID Planned Done Actual Done

Program Stakeholders

Role Name IRC
EPM Bobby Chien bchien
EM Kan-Ru Chen kanru
PM Ravikumar Dandu
TL
UX Tina Hsieh
QA Mike Lien
  • EPM = Engineering Program Manager
  • EM = Engineering Manager
  • PM = Product Manager
  • TL = Tech Lead
  • UX = User Experience
  • QA = Quality Assurance

UX Specs


Reference Links