Automated Test Coverage
Jump to navigation
Jump to search

Project Description
Enter text here
Requirements:
Enter text here
User Stories and Acceptance Criteria
| Title | BUG ID | User story | Acceptance Criteria |
|---|---|---|---|
| Removal of python from the Marionette harness | Bug ID | User Story 1 TBD | Acceptance Criteria 1 TBD |
| Bug ID | User Story 2 TBD | Acceptance Criteria 2 TBD | |
| Integration of Marionette test suite with Raptor | Bug ID | Real Bug # and User Story pending sync up with Eli | Acceptance Criteria pending |
| Device testing on TaskCluster / Treeherder with Bitbar | Bug ID | User Story 1 TBD | Acceptance Criteria 1 TBD |
| Bug ID | User Story 2 TBD | Acceptance Criteria 2 TBD |
Automated Test Coverage
| Milestone | Due Date | Status | Notes |
|---|---|---|---|
| Convert integration tests from GIP to GIJ | 12/31/15 | AT RISK | All but 14 have been converted. Engineers out on PTO. |
| Intermittently failing tests fixed | 01/31/15 | CHALLENGED | Engineers are disabling the tests that fail intermittently and will fix them before re-enabling. Need more engineering help with this. |
| Tests that work on mulet work on device | 01/31/15 | CHALLENGED | It's being reported that some of the flagged tests actually work on device. Need to reassess all. |
| Test Matrix created that defines platform(s) the tests are going to run on | 12/31/15 | AT RISK | Draft of matrix completed but there are still some tests that need to be evaluated for appropriate testing environment. Won't get this done until January. |
| Automation of tests according to Test Matrix | 05/31/16 | ON TARGET | Draft of matrix completed but there are still some tests that need to be evaluated for appropriate testing environment. Won't get this done until January. |
| Every single commit in gecko/gaia triggers automated tests | 05/31/16 | ON TARGET | There's still work that needs to be identified and scheduled. |
| MozTrap scenarios automated using GIJ when feasible | 05/31/16 | ON TARGET | |
| Working Mulet tests actively maintained with reporting on Treeherder | 05/31/16 | ON TARGET | |
| Code Coverage Tool developed | 12/31/15 | AT RISK | Originally targeted for end of Q4, but assistance at Mozlando didn't happen. |
Status Key
| Color | Status | Key |
|---|---|---|
| On Target | The project or deliverable is expected to meet its due date. | |
| Challenged | The project or deliverable is facing an issue that might cause it to miss its due date, but a “get well” plan has been developed to get it back on track. | |
| At Risk or Late | The project or deliverable is blocked or facing an issue that might cause it to miss its due date, and there’s no “get well” plan to get it back on track, or it is already late. | |
| Done | The project or deliverable has been completed. | |
| On Hold | The project or deliverable has been placed on hold. |
Program Timeline
MVP Scope
Querying by 2.6+ features
(please add correct bug tracking number)
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
Dependency Tracking
Detailed Program Plan
| Action Item | Engineering Owner | QA Owner | UX Owner | Bugzilla ID | Planned Done | Actual Done |
|---|---|---|---|---|---|---|
Program Stakeholders
| Role | Name | IRC |
|---|---|---|
| EPM | ||
| EM | ||
| PM | ||
| TL | ||
| UX | ||
| QA |
- EPM = Engineering Program Manager
- EM = Engineering Manager
- PM = Product Manager
- TL = Tech Lead
- UX = User Experience
- QA = Quality Assurance

