Marketing/Billion Downloads campaign postmorterm
Jump to navigation
Jump to search
Week 1
Week 2
Week 3
Week 4
Week 5
Teams involved
- Marketing
- IT
- WebDev
- QA
- l10n
- PR
Timeline
Week 1
July 7
- Marketing team asks interns to lead a community campaign
July 9
- Creative: contacted to design logo and banner for campaign
- Metrics: contacted to determine date of billionth download
- Metrics replies saying to talk to Community Marketing
Week 2
July 14
- Billion Downloads campaign prestented to Marketing team and approved
- Launch scheduled for mid-August
- Site planned to be ready by end of July
July 16
- Promo: CMT asked to send in photos for the site by July 31st
July 17
- Interns conduct phone conference with SO about webdev
Week 3
July 20
- Copy ideas brainstormed
- l10n contacted with initial timeline of late July / early August launch
July 21
- Initial creative mockups received from Sean
July 22
- Promo: Facebook group created
July 23
- Marketing meets with SO, who provides first site mockup
- IT: Domains purchased
- IT: Bug filed to setup website, with request to push production branch with splash page (bug 506062)
- QA: Contacted to help test site
Week 4
July 27
- Copy finalized and sent to SO
July 28
- Creative: Banner design finalized
July 29
- IT: Metrics tracking code requested (bug 507238, major severity)
- l10n: Opt-in bug for localizers created (bug 507293)
- QA: begins to QA site on the trunk (bug 507286)
- 5:30pm - PR: Media outreach email sent with link to onebillionplusyou.com
July 30
- 2:45pm (approx) - First press articles appear with links to onebillionplusyou.com, which currently shows 404
- 3:15pm - After meeting with WebDev, onebillionplusyou.com setup bug upgraded to blocker (bug 506062)
- 3:52pm - IT: onebillionplusyou.com now shows splash page (bug 506052); however, other domains are not redirecting to onebillionplusyou.com
- 5:20pm - Metrics tracking code request upgrade to critical severity (bug 507238)
- 5:55pm - Promo: CMT emailed about campaign, including link to onebillionplusyou.com
- 10:45pm - IT: Other domains now redirect properly to onebillionplusyou.com (bug 506052 resolved)
July 31
- 11:30am - SO asked if site can be launched today, if necessary
- 11:45am - l10n begins localizing page (bug 507680)
- 12:35pm - SO confirms that site can be launched today
- 12:40pm - IT: staging site is setup (bug 507143)
- 2:15pm - Marketing decides to push launch to today, only initially shipping in 5 languages
- 2:30pm - IT: bug filed to launch site (bug 507710, critical severity)
- 2:57pm - WebDev concludes security testing
- 5:00pm - Cron job works on staging site (bug 507143)
- 6:57pm - l10n & IT: First five locales finalized; bug filed to launch site (bug 507710, critical severity)
- 10:03pm - IT: Site launched in five locales (bug 507710 resolved)
August 1
- 1:00am - Metrics code received (bug 507238 closed)
- 1:14am - WebDev: email feedback provided about launch of site and revisions to make
- 10:49am - Omniture code added to trunk
Week 5
August 3
- 8:00am - Code optimized with CSS changes
- 2:50pm - IT: Bug filed to update site to include 28 locales (bug 508083)
- 3:49pm - IT: Site updated with new locales, layout appears broken to Marketing team (possibly a caching issue, either client or server side)
- 3:56pm - IT: Request to revert back to original site with 5 locales (bug 508083)
- 4:04pm - IT: Site reverted to revision 48301.
- 8:53pm - Beltzner reports that site is displaying in wrong language for users
- 9:35pm - IT: Cache cleared. Appears to have fixed language problem.
- 11:42pm - Revision 48301 reported to be buggy and has caching issues
- 11:43pm IT: Bug filed to update to revision 48448 to fix the caching issue
August 4
9:50am - SO optimizes CSS
August 5
10:20am - IT: Bug filed to update to revision 48615
- All times in PDT
What worked well
Issues
- QA was approached late
- This made us rush
- We didn't know about bit.ly, and tested functionality, which worked on the surface, but the bit.ly links were broken, as William discovered
- Weights and measures (metric, etc.) caused confusion
- PR timing of the announcement in conjunction with the actual billionth download - as stated by the Twitter account
- Potential Issues to the timing of the Site
- Was there any way that we could have tracked the potential interactions we missed with the timing issue?
- Was this ever thought about to drive downloads?
- If people who are IE/Safari/Chrome users visit the site because they wrote an article about it, there is no place that says "download FFx here" etc.
- What about an "upgrade" button to drive people that have Ffx 1.0 or 2.0 to upgrade to 3.5
- Issues to the actual copy of the site:
- In the "mission" blurb we reference the MoFo, we usually reference only Mozilla. Not the foundation specifically
- The Link to Find out more about the mission links to the organic software page - not the "what is Mozilla page" so it doesn't really talk about the mission etc.