San Diego 2012 Hack Targets

 

Status, Wed May 9.

  • [AT RISK] Gaia Lockscreen (Vivien) - blocked on UX.
  • [AT RISK] Gaia Homescreen (Vivien) - blocked on UX.
  • [AT RISK] Gaia Dialer/contacts (Etienne) - blocked on UX.
  • [ON TRACK] Gaia New call screen (Etienne) - https://www.dropbox.com/s/hnby51wvjwbcrug/separate-call-screen.mov Blocked on bug 741587 owned by jlebar, ETA EOD.
  • [MISSED] Gaia SMS (Tim): Cancel - new UX designs from this week are being implemented by new Taipei engineer next week. Bent can demo new OOP IndexedDB backend though.
  • [AT RISK] Platform: Gralloc (Michael V) - no promises yet, check back Thurs early.
  • [DONE] Platform: Push Notification (Fernando): Fully demo-able. Need to implement HTTPS, persistent connections and origin verification, but don't block demo.
  • [ON TRACK] Platform: Orientation change/resize (David F) - Blocked on bad sensor data on Nexus S: bug 753245.
  • [ON TRACK] Platform: Orientation lock (Cervantes) - bug 743638 landed on inbound, need to find an app that uses it to demo (video?)
  • [AT RISK] Platform: Proximity sensor (Etienne) - blocked on SGS2 bug 752683, owned by dougt.
  • [AT RISK] Platform: Ambient light sensor (Vivien) - API already spec'd, blocked on sensor firing events (same sensor on sgs2 problem as above)
  • [ON TRACK] Platform: Web intents (Fabrice) - WIP patch done. Etienne working on multiple providers UI, maybe can use that to demo.
  • [DONE] Platform: Camera (Michael H) - Ready by Friday, demo some filters, etc
  • [DONE] Platform: Bluetooth demo (Eric) - Demo scenario: enable, browse, connect, disconnect
  • [AT RISK] Platform: Media storage API (Jonas) - Demo scenario: don't know how to demo this item because codes are not checked in yet.
    • Status: Jonas is still working on this. He hopes he could finish this before this Friday.
  • [AT RISK] Platform: USB Host mounting (Dave H) - Dave H did not come to this work week. (checking to see if demoable anyway)
  • [ON TRACK] Platform: IndexedDB OOP (Ben T) - Demo scenario: SMS.
  • [AT RISK] Radio: MMS (Vicamo) - Demo scenario: send MMS (picture only) from another phone that does NOT use b2g, receive MMS from a phone that use b2g, display the MMS message.
    • Status = not completed yet. MMS needs a new database storage. Vicamo is working on it.
  • [AT RISK] Radio: 3G Data + Network UI (Kaze)
    • Status: 3G Data is NOT ready; Network UI is blocked by UX. Kaze is discussing with UX team about the demo.
  • [DONE] Apps: Email (Andrew S) - Demo scenario: Browse, compose mails.
  • [DONE] Apps: Calendar (James) - Demo scenario: Show calendar + create events.
  • [DONE] Testing: Test harness (Philipp) - Demo scenario: Show tests, how to do the testing...