Firefox OS/TPETeams/2014-10-29

From MozillaWiki
Jump to: navigation, search

Taipei Teams

Bugs and features status

Project relevant topics

  • 2.2 milestone
    • Dev start: 2014-11-24
    • FLRR: 2015-02-09 2 weeks before FL
    • FL: 2015-02-23 (Gecko 38 will be the base)
    • FC: 2015-04-06
    • CC: 2015-05-18
  • The bugs filed after CC and reproducible in reference phone should be owned by OS team.
  • To join the TAM triage meeting with device team.

Feature topics

  • 2015 Target features.
    • Planning porker - Friday.
    • Improve Battery life
      1. Need each teams involved.
      2. Steps
        1. To define user scenarios - UX/PM/QA.
        2. To have a power consumption data - QA.
        3. To file bugs for those scenarios have higher power consumption than reference device. 15%?
  • Any problem in features planning?

Portland WW

EPM

  • Clarify tracking-b2g.
  • Can EPM ask TAM to provide priority for the bugs passing to OS team?

Others

  • Seats after Portland WW.
  • Team building.