Firefox OS/TPETeams/2015-01-14

From MozillaWiki
Jump to: navigation, search

Discussion Topics

  • 2.2 Features and L porting.
    • Difficulties.
  • V3 idealization
    • The new idea dateline is on 1/27
  • Targets of teams in 2015Q1.
    • Performance team -
      • To build the draft performance profile for Quad-core.
      • To improve the usage of Quad-core.
      • To sync performance measurement tools with QC
      • To fix the blockers of 2.2.
      • To integrate task tracer with build-in profiler (SPS).
      • To land the memory profile tools
    • Telephony platform team -
      • To finish Android L porting for telehphony functions.
      • To fix the blockers of 2.2.
      • To finish the implementation of freezing interface.
      • To have the draft implementation of network management enhancement.
      • To Refine Telephony API for CDMA.
      • To enable test cases on KK emulator.
      • To join the V3 ideation group(P2P work) for cellular data connection topics.
      • To have a technical talk for teams.
    • Connectivity platform team -
      • To finish Android L porting for WIFI and network functions.
      • To support the new NFC webapi.
      • To fix the blockers of 2.2.
      • To improve the accuracy of data metering for cost control function.
      • To improve the network state machine for multiple connections.
      • To join V3 ideation group( P2P work) for NFC and wifi topics.
      • To have a technical talk for teams.
    • Gfx team -
      • To finish copy& paste for 2.2.
      • To finish Android L porting for gfx functions.
      • To fix the blockers of 2.2.
      • To identify the improvement plan of performance for 2015.
      • To identify the improvement plan of test flow for 2015.
      • To identify the improvement plan of debug flows and tools for 2015.
      • To join the v3 ideation group(Foxeye) for graphics topics.
      • To have a technical talk for teams.
    • Multimedia Platform team -
      • To fix the frame dropping problem for 2.2.
      • To make sure the clear key feature of DRM works on firefox OS.
      • To fix the blockers of 2.2.
      • To finish Android L porting for camera functions.
      • To replace OMS codec with Media codec.
      • To finish the draft audio refactor with perf off.
      • To enable test cases for KK emulator.
      • To host the v3 ideation group(Foxeye).
      • To have a technical talk for teams.
    • Gaia System team -
      • To support the enabling/disabling functions in settings app for volte.
      • To finish the copy&paste for gaia part.
      • To fix the blockers of 2.2.
      • To finish the implementation for Keyboard features.
      • To finish the system2 App refactor.
      • To finish the lockscreen refactor.
      • To improve the Gaia build script.
      • To work with Multimedia team for Audio refactor.
      • To share how to use bugzilla flags with teams.
  • Task Forces
    • To have experts for DOM. Leader: Gina(Device).
      • Aknow, TingYu, and Jonathan from platform teams.
    • To improve threading mechanism of firefox OS(Quadcore/8core). Leader: Thinker.
    • To improve test framework for firefox OS. Leader: Hsinyi.
    • To support the webapi for what Gaia dev request. Leader: Tim.
    • To improve system stability. Leaders:?
    • To support 64bits in firefox OS. Leader:?