Platform QA currently has a significant infrastructure in the QA Lab in MTV2 on the second floor. We wish to move the machinery to a data center for the following reasons: | Platform QA currently has a significant infrastructure in the QA Lab in MTV2 on the second floor. We wish to move the machinery to a data center for the following reasons: | ||
* UPS backup of power. | |||
* Remote control off and on. | |||
* Scaling of virtual machines. | |||
This is a (living) plan to accomplish this. The goals is to have most of the functionality of the systems replaced by end of Q3 2015. | This is a (living) plan to accomplish this. The goals is to have most of the functionality of the systems replaced by end of Q3 2015. | ||
Another problem is that our ESX server is currently at or over capacity. We have too many VMs on it, and we are going to need to be able to add more as new versions of operating systems ship (Windows 10, Mac OS X 10.11 El Capitan). | |||
= Systems in place = | = Systems in place = | ||