Unified Telemetry/Data Continuity: Difference between revisions

Jump to navigation Jump to search
(→‎Goal: blech)
 
Line 3: Line 3:
* Complete the executive dashboard with both v2 and unified telemetry
* Complete the executive dashboard with both v2 and unified telemetry
** [https://bugzilla.mozilla.org/show_bug.cgi?id=1175583 tracking ticket]
** [https://bugzilla.mozilla.org/show_bug.cgi?id=1175583 tracking ticket]
** [https://docs.google.com/document/d/1VzQHfzfA-S_lO2wpXDFjDzSJntJCMwP03TzefIj7RrE/edit#heading=h.69zh7w46tg7s working doc\]
** [https://docs.google.com/document/d/1VzQHfzfA-S_lO2wpXDFjDzSJntJCMwP03TzefIj7RrE/edit#heading=h.69zh7w46tg7s working doc]
* Complete the search retention report with [https://bugzilla.mozilla.org/show_bug.cgi?id=1199458  both v2 and unified telemetry]
* Complete the search retention report with [https://bugzilla.mozilla.org/show_bug.cgi?id=1199458  both v2 and unified telemetry]
* Revisit the longitudinal/experiment use cases and make sure we have a reasonable way to access the data for those cases
* Revisit the longitudinal/experiment use cases and make sure we have a reasonable way to access the data for those cases
Line 10: Line 10:


==Goal==
==Goal==
To be sure the transition from FHRV2 to Unified Telemetry happens in a predictable way that meets company needs.
To be sure the transition from FHRV2 to Unified Telemetry happens in a predictable way that meets company needs.  


===Scope===
===Scope===
Line 16: Line 16:


==Duration==
==Duration==
estimated project time
plan is wrap and present to executives on october 13th
 
==Projects==
list any sub-projects - depending on complexity you may want to create a project page for each sub-project

Navigation menu