== Project Updates ==
== Project Updates ==
* (peterbe) Wanna monitor QA saucelabs tests?
* (peterbe) Wanna monitor QA saucelabs tests?
** do we want to tighten the loop?
** there's a long delay with the QA tests being used by monitoring
** tests failing on stage don't block a prod release, now
** we had a bunch of flakey tests, and so removed the alerting in irc
** now we only see them as bugs filed by QA after the fact, easy to miss
** schedule something after this meeting
* (peterbe) Graphics update
* (peterbe) Graphics update
** lars has a giant pull request being a blocked by an external dashboard run by the graphics team
** peter wrote an alternate way for them to get the data on-demand instead of through cron + warehousing
** PR is open for them, waiting on them to switch
* (adrian) shipped links from postgres powered to es powered reports
** email coming
** looking for feedback, will mail stability.
* (peterbe) featured versions maintenance need to be set on prod and stage
** button on stage to match prod is up in a PR
** baby step towards full automation
* (lars) signature shortening change is coming
** 5PM if JP is available, we will cut over to the new abbreviated signature method
** if he is not, we will do it tomorrow instead
** a few minutes of instability, insignificant