442
edits
(→Planned for Next Period: format) |
(→Exec Summary: items) |
||
| Line 11: | Line 11: | ||
=== Exec Summary === | === Exec Summary === | ||
* | Project broken into 3 stages - POC/validation, handling unexpected differences, Operationalization. | ||
POC: | |||
** Executive dashboard with consolidated data set | |||
** Plot both lines, show values on roll over (and % difference) | |||
** High level metrics showing how much change is introduced in v4. For each measure, take last monthly value and have a table on the page. Explains the difference in the measures. | |||
=== Risks/Issues === | === Risks/Issues === | ||
edits