Confirmed users
1,085
edits
DavidBolter (talk | contribs) (added a meeting) |
DavidBolter (talk | contribs) (added relman) |
||
| Line 16: | Line 16: | ||
==== Actors ==== | ==== Actors ==== | ||
* An Engineering Release Boss is assigned to each release, tasked with making sure things keep running, and we have nothing falling between the cracks. | * An Engineering Release Boss is assigned to each release, tasked with making sure things keep running, and we have nothing falling between the cracks. | ||
* The Release Manager assigned to the same release is a critical partner. | |||
* Weekly meetings | * Weekly meetings | ||
** Mondays, 2-3pm PST, in ReleaseCoordination vidyo room | ** Mondays, 2-3pm PST, in ReleaseCoordination vidyo room | ||