Changes

Jump to: navigation, search

TestEngineering/Performance/Sheriffing

No change in size, 12:55, 15 January 2018
title case
== Determining if we have all the data from Treeherder ==
Since an alert is a suggestion of the original changeset, I always open the graph view, zoom in to a narrow window, then open the test job (from the link shown when clicking on a data point) of a job in the future. Then I filter the treeherder Treeherder view down and show the next 10 jobs. This gives you a range of pushes to see coalescing, retriggers, and allows you to fill in the holes by retriggering and scheduling jobs.
Here we are looking for a few things:
* Do we have data for the revision before / after the revision we have identified as regressing? If not, we should consider filling in the missing data.
160
edits

Navigation menu