497
edits
(minor wording change) |
(Added merge automation to the end of early beta steps) |
||
| Line 431: | Line 431: | ||
==The following needs to be performed at the End of Early Beta== | ==The following needs to be performed at the End of Early Beta== | ||
Please Note: This is performed on the Friday at the midway point of the beta cycle | Please Note: This is performed on the Friday at the midway point of the beta cycle. This is typically after beta 5 has been released. This should be done before pushing any other uplifts to beta after beta 5. | ||
# | # Submit a Early -> late beta merge automation with Dry Run disabled in Ship-it | ||
# Start the Early -> late beta merge automation | |||
# | |||
After the job runs, verify that the commit was pushed to the mozilla-beta repo, see [https://hg.mozilla.org/releases/mozilla-beta/rev/29e6215562511ffef7bfa73bed97093ec3d8cdd4 example]. | After the job runs, verify that the commit was pushed to the mozilla-beta repo, see [https://hg.mozilla.org/releases/mozilla-beta/rev/29e6215562511ffef7bfa73bed97093ec3d8cdd4 example]. | ||
edits